KBR multicomp D6 Series Connection Manual Download Page 10

V7.00

24449_EDEK

ZA0031-2619-1_DE-EN

10

3.1 

Controller not preconfigured

If an unconfigured controller is to be started up, the following procedure has to be per-
formed step by step. 

1. Configuring additional modules 

(multisio D2-1T2RO, multisio D2-4RO, multisio D2-4CI and multimess 14)

If there are no additional temperature, relay or induced current measuring modules, this 
step can be skipped. To configure additional modules, connect them and the supplied 
bus line to the basic module. The additional modules can then be activated individually 
using a scan mode, which has to be triggered via the basic module‘s operating panel 
and the DIP switches or scan buttons on the additional module. If the compensation unit 
consists of several cabinets, the correct cabinet assignment has to be set up.

Detailed instructions for this step are given in chapter Settings under Modules / Display 
submenu. 

2. Configuring current transformer values

For the compensation controller to function properly, all current transformer parameters 
have to be set correctly. Primary and secondary current of the transformer have to be set. 
These parameters can be read on the nameplate of the current transformer. In addition, 
the phase assignment of the transformer has to be set correctly. In the controller, the 
phase (L1, L2, L3) in which the current transformer is integrated has to be set.

You can find more detailed information on this topic in chapter Start-up under Transfor-
mer settings submenu. 

3. Setting target cosine:

You can ask your energy supply company for the target cosine, which should be set up 
at this point. The target cosine is by default set to 0.95 inductive (see chapter Default 
settings).

You can find more detailed information on this topic in chapter Start-up under Target 
cosine submenu.

Summary of Contents for multicomp D6 Series

Page 1: ...24449_EDEKZA0031 2619 1_DE EN Information Connection and start up multicomp D6 xxx 7 System I English ...

Page 2: ...ser at all times e g in the switchgear cabinet Even if the device is resold to third parties the manual remains an inherent part of the device Although the utmost of care has been taken in putting together this user manual errors may still occur We would be very grateful if you could notify us of any errors or unclear descriptions you may notice Disclaimer The contents of these operating instructi...

Page 3: ...uct its operation or the respecti ve part of the operating instructions to which special reference is being made 1 3 Safety notes In order to prevent operating errors device operation is kept as simple as possible This will enable you to start your device up quickly In your own interest however the following safety notes should be read carefully The applicable DIN VDE regulations must be observed ...

Page 4: ...from the power supply Error detection repair and maintenance work may only be carried out in our facilities or after contacting our service team Opening the device unauthorized shall render your warranty null and void Correct operation can no longer be guaranteed Opening the device may expose live parts Capacitors in the device may still be under load even if the device has been disconnected from ...

Page 5: ...her the local power supply conditions comply with the specifications on the nameplate A faulty connection can lead to the destruction of the device A different power fre quency influences the measurement accordingly The device must be connected in accordance with the connection chart Systems that are at risk from lightning strikes must feature lightning protection for all input and output lines CA...

Page 6: ...red current will be negative Prerequisite is that energy is consumed Assignment measuring voltage input current transformer input The current transformer on terminal 20 21 k1 l1 must be arranged in the phase where the measuring voltage for terminal 10 L1 is measured The device will display positive current when connection and energy flow direction are correct If connected incorrectly the current d...

Page 7: ...max C2 automat max C2 Automat max 1 A slow blow max 1 A träge max C2 automat max C2 Automat max 1 A slow blow max 1 A träge circuit breaker Trennvorrichtung circuit breaker Trennvorrichtung PE For supply voltage see type plate Versorgungsspannung siehe Typenschild Netz power Messspannung measuring voltage Hauptstrom main current CAUTION The coil voltage for the capacitor contactors and the measuri...

Page 8: ...suring range from 500V to 30 0 KV Ph Ph 20 k1 and 21 l1 Measuring input for current The measuring input for current must be connected via a current transformer x 1A AC or x 5A AC When connecting the transformer pay attention to the energy flow direction and to the correct assignment of measuring volta ge input to current transformer 30 C and 31 S Floating relay contact This contact serves as a mes...

Page 9: ...ne helps you to correctly start up the compensation controller multicomp D6 xxx 7 It provides you with step by step instructions to help you find the options relevant for you in the operating instructions To begin with there are two cases in which the start up procedure for the multicomp D6 xxx 7 differs Case 1 You have bought a complete compensation system from KBR and the controller is already i...

Page 10: ...t up Detailed instructions for this step are given in chapter Settings under Modules Display submenu 2 Configuring current transformer values For the compensation controller to function properly all current transformer parameters have to be set correctly Primary and secondary current of the transformer have to be set These parameters can be read on the nameplate of the current transformer In addit...

Page 11: ...the circuit diagram cover sheet or the nameplate of the stage If the compensation unit consists of several cabinets the cabinet assignment should be adjusted accordingly Detailed instructions for this step are given in chapter Start up under Stages submenu 5 Function test After all values have been programmed a function test should be performed To do so the controller has to be taken off the volta...

Page 12: ...ter Start up under Transformer settings submenu 2 Function test After all values have been programmed a function test should be performed To do so the controller has to be taken off the voltage supply for a few seconds After re connecting it to the voltage supply the controller has to start automatically If the cosφ voltage is read out in the cosφ act menu immediately after switching it on the val...