ACCESSORIES
.......................................................................................................................01
1 INTRODUCTION
• 1.1 Use conditions of the unit .................................................................................................01
2 SAFETY CONSIDERATION
...........................................................................................02
3 BEFORE INSTALLATION
• 3.1 Handling of the unit ..........................................................................................................04
4 IMPORTANT INFORMATION ON REFRIGERANT
.............................................05
5 SELECTION OF INSTALLATION SITE
....................................................................05
6 PRECAUTIONS ON INSTALLATION
•
6.1 Outline dimensional drawing
............................................................................................06
• 6.2 Requirements of arrangement space of the unit ..............................................................07
• 6.3 Installation foundation ......................................................................................................08
• 6.4 Installation of damping devices ........................................................................................08
•
6.5 Installation of device to prevent snow build-up and strong breeze
.................................09
7 CONNECTION DRAWING OF PIPELINE SYSTEM
...........................................10
8 OVERVIEW OF THE UNIT
• 8.1 Main parts of the uint ........................................................................................................ 11
• 8.2 Opening the uint ...............................................................................................................12
•
8.3 Outdoor unit PCBs
...........................................................................................................13
•
8.4 Electric wiring
...................................................................................................................16
• 8.5 Water system installation .................................................................................................23
9 STRAT-UP AND CONFIGRUATION
...........................................................................27
10 TEST RUN AND FINAL CHECK
•
10.1 Check item table after installation
..................................................................................28
• 10.2 Trial run ..........................................................................................................................28
CONTENTS
Summary of Contents for KEM-HT-75
Page 56: ...16127100001537 V B...
Page 57: ......