Installation & Owner‘s Manual
2
1.1
Packing list and installation components
1. Please check the packing list of the centralized controller,whether the components are
complete.
2. Installation assemblies prepared on the site
No.
Name
Quantity
Remarks
1
Centralized controller
1
2
Cross-recessed head tapping
screws
6
GB845/ST3.9*25-C-H(S)
3
Fastening plastic expansion pipe
6
Φ6*30
4
Installation & Operation Manual
1
5
Matching resistance
4
120 Ω
No.
Name
Quantity
(install into
wall)
Selected model
Remarks
1
3-core control
shielded cable
2 PCS
RVVP-300/300 3×0.75mm
2
One for communicating with
the air conditioner; the other
for communicating with the
computer.
2
3-core cable
1 PCS
RVV-300/500 3×1.5mm
2
For power supply of the
centralized controller
3
Switch box
1 PCS
————
————
4
Wire pipe(jack
casing pipe,
captive nut)
2/3 PCS
————
————
5
Tighten strip
Several
pieces
————
For binding cables(as the
case maybe)
Summary of Contents for KCCT-64 I (B)
Page 3: ...Installation Owner s Manual 1 INSTALLATION PART ...
Page 10: ...Installation Owner s Manual 8 OPERATION PART ...
Page 28: ......