28 / 51
requiring protection must extend 100mm beyond both sides of the door and at least 400mm in
front of it. The protective layer should be a metal sheet with a thickness of at least 1mm.
2.5.1 Stoves with an extended door
The floors of the sauna and the room into which the stove door opens must be on an equal level.
The room with the stove door may also be on a lower level, but never higher than the sauna's
floor!
The stove and its extension must be installed on a sturdy, immovable, fireproof, level
surface. A cast concrete base is the best choice.
By adding fireproofing the stove and its door extension may also be installed on wooden
floors.
Nevertheless, the dividing wall must be non-flammable (brick, concrete or similar). For the
sauna and the extended door, a concrete slab with a thickness of 60mm is usually acceptable
(remember to take care of moisture draining). The fireproofing on the sauna side floor must
extend 250mm in front of the stove, 250mm at its sides and 250mm behind it or, at the back and
sides, up to a fireproofed wall. The fire protection measures on the door side must also adhere to
the instructions in chapter 2.3.
In unclear cases consult the local fire safety officials.
2.5.2. INSTALLATION THROUGH THE WALL AND FITTING THE FRAME , JK
See also the instructions in chapter 2.6. concerning flue pipe installation.
Make sure that you have received the frame that belongs to the door extension.
Installation through the wall:
•
Make a hole in the wall. Its size should leave about 10-20mm of clear space all around
the door extension. (290x450mm), normal door.
•
Remove the stove door by taking the hinge pin off (note the 2 base plates between door
and frame). It is not always necessary to remove the door.
•
Remove the ash door.
•
On the other side of the frame, remove the rivet from its hole in the upper part.
•
Install the stove from the sauna side.
•
Insulate the gap between feed door and wall with fireproof mineral wool. Follow the
instructions of the mineral wool manufacturer!
•
Install the frame into place via the door (do not yet attach it to the wall).
•
Attach the door. Remember the base plates. At this point, you may choose the door's
opening direction.
•
Place the rivet in the upper part of the frame in the remaining hole.
•
Put the ash door into place.
•
Ensure that a gap of 5-10mm remains between extended door and the frame on top of it
to allow for heat expansion.
•
Attach the frame to the wall with six 5mm screws using metal attachments that are
embedded in the wall.
INSTALLATION THROUGH THE WALL AND FITTING THE FRAME, with KSIL door, JK
model
See also the instructions in chapter 2.6 concerning chimney installation.
Installation through the wall:
•
Make a hole in the wall. Its size should leave about 10-20mm of clear space all around
the door extension. Width 445mm, height 555mm..
•
Remove the door frame by pulling from the wall lead-through pipe.
•
Push the stove to its place from the sauna side.
•
Remove the covering frame. (if in place)
•
Loosen the fastening screws of the frame (4 pcs) on both sides, they need not be
removed).
Summary of Contents for SAGA 20
Page 1: ...SAGA 20 SAGA 20...