STEP 1
STEP 2
STEP 3
Q
M
L
GO
OP
#1 =
Cover entire swedge joints with GOOP and
join FRONT and REAR side channels together.
Be sure the connecting plates overlap and bolt
together with bolts
Q
, washers
L
and lock nuts
M
.
#
1
=
Slide REAR BAR
on to
REAR SIDE BEAMS
J
#
2
=
Fully
insert
LOCK PINS
completely to the bend of the pin
KS
_11_1.1
GOOP APPLICATION
Apply a healthy air tight bead of goop
around
every
swaged joint as shown, to
prevent moisture from leaking into and out
of the joint. If this is not done properly, the
inside surface of the tubes can rust and
rusty water can leak out. Maintain this
joint seal throughout the life of your rack.
Swaged joint & holes
Smooth goop at swaged joint & holes
GOOP
GOOP
J
D
06
D
D
04
06
GOOP
G
I
#
1
=
Cover entire swedged joint surfaces with GOOP.
Slide FRONT CROSS BAR
A
into FRONT SIDE BEAMS
03
&
05
.
#
2
=
BOLT TOGETHER with TOP (small tube)
& SIDE RAIL (large tube), as shown, using bolt
G
& nut
I
.
The allen wrench is included in the package.
05
A