background image

 
 

For Technical Support Call: 800-343-7486, Monday-Friday, 7AM - 4 PM (PST) 

Page 3 

 

Instructions – 40020 

Step 1 – Determine Location of Door Kit 

 

Decide where you want the door kit to be 
installed. Be sure there is the correct 
spacing between shelves. The bottom shelf 
of the desired opening must have the shelf 
lip facing downward. 

 

Bottom position can only be used with 
purchase of additional 32” floor lip 
(48215). 

 

Standard shelf placing and orientation 
shown. 

Step 2 – Bolt Door to Shelf Below 

 

Bolt door kit to flat space on shelf below using a #10 x 5/8” machine screw, a #10 flat 
washer, and a #10 flanged lock nut. 

 

Repeat 3 more times along shelf and door kit assembly. 

 

Be sure when the door kit is folded up, it sits flush with the outside of the shelf. 

 

Snug tighten but allow for movement. 

 

Reviews: