background image

16 

English 

5.906-492.0 Rev. 00 (12/10)

1

23456789

10

11

12

13

N

L1

PE

PEPEPEPEPEPEPEPEPE

-DS1

fma

2031399

00

SMD-W

5181379

SLP

00

B1

DS1

M1

N1

S1

S2

X1

X2

ELEKTRODEN

SAUGTURBINE

HAUPTSCHALTER

LEUCHTDIODE

STEUERELEKTRONIK

UMSCHALTER-BETRIEBSART

NETZSTECKER

STECKDOSE

TE

B1

DS1

M1

N1

S1

S2

X1

X2

ELECTRODES

VACUUM MOTOR

MAINSWITCH

LIGHT EMITTING DIODE

SWITCH ELECTRONIC UNIT

CHANGE OVER SWITCH OPERATING MODE

POWER SUPPLY PLUG

PLUG SOCKET

TE

B1

DS1

M1

N1

S1

S2

X1

X2

ÉLECTRODES

TURBINE D´ASPIRATION

INTERRUPTEUR PRINCIPAL

DIODE ÉLECTROLUMINESCENTE

UNITÉ ÉLECTRONIQUE DE COMMANDE

COMMUTATEUR MODE D´EXPLOITATION

PRISE D´ALIMENTATION D´ÉNERGIE

PRISE DE COURANT

TE

B1

DS1

M1

N1

S1

S2

X1

X2

ELECTRODOS

FOTODIODO

TURBINA DE ASPIRACIÓN

SISTEMA ELECTRÓNICO

INTERRUPTOR PRINCIPAL

INTERRUPTOR MODO OPERATIVO

ENCHUFE DE SUMINISTRO DE ENERGIA

TOMA DE CORRIENTE

TE

*

nur bei Variante TE only for variant TE seulement  pour la variante TE solamente para la variante TE

D

GB

F

E

white / neutral

X1

black / phase

*

X3

X2

white / neutral

black / phase

S1

X12

X13

X15

X14

****

N1

X11

X10

white / neutral

black / phase

X2

*

B1

M

1~

M1

X5

X6

X1

X4

X1

*

*

*

white

neutral

black

Phase

protective

conductor

120V 1~ 50/60Hz

white / neutral

Phase / black

green (yellow)

1

24

S2

*

X7

X8

X9

Erdung:  Saugstutzen

Grounding:  Suction nipple

Mise à la terre:  Tubulure d´aspiration

Toma de tierra:  tubuladura de aspiración

ANLAGE

plant

installat.

AUFTRAG

order no.

order no.

ORT

location

lieu

BENENNUNG

identification

identification

ANLAG.-BEZ.

plant desig.

denomin.

Stromlaufplan

circuit diagram

plan de circuit

NT 14/1

ZEICHNUNGS-NR.

drawing-no.

Dessin No.

BLATT

page

page

BLATTZ.

page tot.

page tot.

2010-07-05

Datum

date

date

ANZ.

no.

no.

Ä-IND.

ch.-ind.

ch.-ind.

NORM

stand.

stand.

GEPR.

check

vérif.

GEZ.

draft

dessin.

File:

NT14_1

ura

22

0.089-158

=S

LP

+

S

Winnenden

ÄND./FR.

change/rel.

change/rel.

ERS.F.

exch. of

rempl.

Dokument

document

Dok-Vers.

doc-vers.

doc-vers.

Dok-Nr.

doc-no.

doc-no.

Summary of Contents for NT 14/1

Page 1: ...English 5 906 492 0 Rev 00 12 10 1 NT 14 1 Service Manual...

Page 2: ...1 Classic 11 5 7 Replace the electrodes 11 5 8 Replacing the suction turbine 12 5 9 Filter dedusting 12 5 10 Replace the handle 12 6 Maintenance and care 13 6 1 Exchanging the flat pleated filter 13 6...

Page 3: ...diagrams as well as third party access to this information is permitted only with the explicit permission of the company Alfred K rcher GmbH Co KG P O Box 160 D 71349 Winnenden www kaercher com Danger...

Page 4: ...receptacle 11 Suction support 12 Chassis lock 13 Floor nozzle 14 Indicator lamp 15 Socket 16 Power switch 17 Suction pipe 18 Carrying handle 19 Suction head 20 Bender 21 Suction pipe storage 22 Elbow...

Page 5: ...0 5 1 Filter cover 2 Suction head lock 3 Dirt receptacle 4 Impeller 5 Guiding roll with fixed position brake 6 Steering roller 7 Suction support 8 Suction head 9 Power switch 10 Carrying handle 4 2 NT...

Page 6: ...uction tube 550 mm 2 Nameplate 3 Exhaust filter 4 Floor nozzle 5 Power cord 6 Pickup for floor nozzle 7 Intake for suction pipe 8 Suction tube 550 mm The type plate is located on the rear of the appli...

Page 7: ...Pull out the lock Replace the lock Replace the pressure spring if necessary 1 Dirt receptacle 2 Bolt electrically conductive 3 Suction support Replace the suction support 5 Basic settings and service...

Page 8: ...nscrew the fastening screws for the cable intake Eco Te and Advanced only Remove the holders Unscrew the fastening screws for the hood Remove the hood 1 Filter cover 2 Suction head casing 3 Power swit...

Page 9: ...ence ring 3 Power switch 4 Control chip Pull the circuit board out toward the top 1 Power switch 2 Micro switch 3 Socket casing 4 Socket 5 Indicator lamp 6 Control chip Remove the socket casing Discon...

Page 10: ...rinted circuit board from holder Replace the circuit board Connect the new circuit board as per the circuit di agram Insert the control printed circuit board into the holder 1 Ferrit ring anti interfe...

Page 11: ...the new mains cable in reverse sequence 1 Electrodes 2 Connecting cable for electrodes 3 Control chip Disconnect the connecting cables from the circuit board and the electrodes Replace damaged connect...

Page 12: ...plug of the turbine 2 Suction turbine Align the new suction turbine as per the marking arrows Connect the connection plug of the turbine Install the turbine casing in the reverse sequence 1 Sliding pa...

Page 13: ...ly locks into place Replace the flat pleated filter Check for proper installation of the flat pleated fil ter Ensure the filter cover properly locks into place Replace the flat pleated filter Check cl...

Page 14: ...0 5 971 013 0 NT 14 1 Eco CH 220 240 V 1 50 60 Hz 1 510 101 0 0 089 158 0 5 962 211 0 5 971 013 0 NT 14 1 Eco GB 220 240 V 1 50 60 Hz 1 510 102 0 0 089 158 0 5 963 211 0 5 971 013 0 NT 14 1 Eco CUL 1...

Page 15: ...N I S T R O D E E N E R G I A T O M A D E C O R R I E N T E T E n u r b e i V a r i a n t e T E o n l y f o r v a r i a n t T E s e u l e m e n t p o u r l a v a r i a n t e T E s o l a m e n t e p a...

Page 16: ...M I N I S T R O D E E N E R G I A T O M A D E C O R R I E N T E T E n u r b e i V a r i a n t e T E o n l y f o r v a r i a n t T E s e u l e m e n t p o u r l a v a r i a n t e T E s o l a m e n t e...

Reviews: