6
OPERATING INSTRUCTIONS
Step 1
Check oil level. Oil level should always be
between the FULL and ADD marks on
the dipstick. Be sure the machine is level
when checking the oil level. (Refer to the
engines operating manual for seasonal
grades.).
Step 2
Fill gas tank with unleaded gasoline.
Do not use leaded gasoline.
Step 3
Connect the high pressure hose to the units
high pressure outlet.
Step 4
Connect garden hose to units water inlet.
Step 5
Connect garden hose to the cold water
source and turn water on completely.
Do not use hot water.
Step 6
Unlock the lock of the trigger gun.
Trigger the gun to eliminate trapped air, wait
for a steady flow of water to emerge from
the spray nozzle.
Step 7
Slide the throttle control to the RUN position.
Step 8
Push the primer ball three times.
Wait 3 seconds between each push.
Note: in cold weather push 5 times.
Step 9
Pull the starter handle. If the engine fails to
start after 3 pulls squeeze the trigger gun
to release pressure, and repeat step 9.
Important!
Do not run the engine with a high or low
oil level as this can cause engine damage.
If you have further questions regarding the
engine, please refer to the engines
operating manual included with the unit.
Summary of Contents for G 2000 QT
Page 1: ...G 2000 QT 9 139 137 06 04 English 2 Español 14 Français 26 ...
Page 38: ......
Page 39: ......
Page 40: ......