5. Maintenance inspection

Test button

This is such a test button that confirms whether
the breaker (NFB) of this machine operates
normally at the time of overheat. One time in a
month, please continue to push the button for
several seconds in operation stoppage condition
(Electricity is flowing). And, please confirm the
illumination of the OVERHEAT lamp, operation
display of overheat P.9), and trip action of the
breaker (NFB) of this machine. (TSK-18 is only
the illumination of the overheat lamp and display
of the overheat operation.)

After confirmation, please turn OFF the source
power supply (factory power supply) and breaker
(NFB) of this machine at first. And please turn
ON once again. (TSK-18 is only input of the
factory power supply.)

Test button

Inspection of the inlet wire net and filter

The wire net is equipped to the inlet of the hot-air generator. (Demi-filter is standard equipped to a part of
hot-air generator.) Please inspect the wire net and filter of the inlet always, and please clean periodically.
Heater case inside becomes the abnormal high temp. and overheat or temp. warning is occured if the wire
net and filter are clogged.

Storage

Please pay attention to the condensation sufficiently in the case that the hot-air generator is stored long
time. Condensation occurs by the temp. of storage atmosphere drops in the winter season. Hot-air generator
becomes freezing condition if this machine is stored in the condition that the condensation occurred, and it
becomes the cause of the malfunction of an electricity part.

Individual inspection

I recommend that is carried out the individual inspection in the case that the use period exceeded 10 years
to have this machine used more safely.

Item of the individual inspection

Measurement of the insulation resistance value

Measurement of the heater current value

Increase bundle inspection of each terminal unit

Other inspection by eyes

Foreign substance mixing inspection and cleaning inside the controller
Foreign substance mixing inspection and cleaning inside this machine and inlet
Action of the electricity part and generation inspection
Please ask to the adjacent electricity businessman about the individual inspection.

Attention

Please do not carry out the insulation resistance voltage test of this machine. (It gets finished
enforcement at the time of shipment.) It becomes the cause of malfunction.

About the electricity fire

Operation condition of the front where stops automatically is started by the input of the primary
power supply in one second after the hot-air generator stopped instantaneously by power failure
etc. We recommend the establishment of the device that blocks the primary power supply to
electricity fire prevention at the time of the disaster of earthquake etc.

-3-

Summary of Contents for TSK-23

Page 1: ...nges this operation manual without taking our permission TSK 122 132 TSK 92 102 Operation manual Total edition Please read without fail before use Thank you very much for purchasing Hot air generator...

Page 2: ...that was enclosed to the outlet and inlet Input terminal A1 A10 and output terminal B8 B10 is malfunctioned by the voltage is applied And output terminal B1 B7 is malfunctioned by the voltage more tha...

Page 3: ...epare separately Recommendation cord Cab tire cable 100mm 2 Please use the commercial power supply 50 60Hz that has the sine wave like to the power supply of the hot air generator Please do not use th...

Page 4: ...s by the temp of storage atmosphere drops in the winter season Hot air generator becomes freezing condition if this machine is stored in the condition that the condensation occurred and it becomes the...

Page 5: ...N switch This is lighted when the operation condition was changed to the external sensor Hot air generator is operated with the external operation signal and external heater ON OFF signal by the switc...

Page 6: ...ouple JISK Heatproof blower Hot air circulation type Breaker NFB Control panel Service terminal Eye bolt Hot air outlet Outlet temp sensor Thermocouple JISK Heatproof blower Hot air circulation type w...

Page 7: ...and external heater input terminal E H is less than DC12V 3 6mA Please prepare the relay that has the contact capacity that can open and close this voltage Please change the external operation mode b...

Page 8: ...case that the remote controller of the option is used For communication of the remote Please input DC4 20mA only TSK 122 and 132 4mA Heater output 0 20mA Heater output 100 Output terminal M3 20P The...

Page 9: ...emp detection OFF OFF OFF OFF OFF OFF External sensor burnout OFF TSK 52HT 62 72 82 92 102 122 132 Action of the hot air generator Blow output Hot air output Temp warning Temp alarm Blower warning Ove...

Page 10: ...f this machine are turned OFF at first and are turned ON again after cooling sufficiently TSK 18 is only input of the factory power supply At the time of overheat sensor burnout Overheat lamp Red are...

Page 11: ...ter cooling sufficiently TSK 18 is only input of the factory power supply When the inlet temp exceeded the upper limit TEMP WARN lamp Red is lighted and present temp is lighted to HOT AIR TEMP Tcc is...

Page 12: ...the time of the furnace upper part establishment Return method Please stop operation by pushing STOP switch And please disarm by turning OFF the breaker NFB of this machine after inside temp of the h...

Page 13: ...s are confirmed And please communicate the display contents The position of the inverter panel differs by the machine type TSK 18 Back side of the control panel service terminal TSK 23 33 The inside o...

Page 14: ...out fail when the wiring is confirmed and readjusted at the time of abnormal 8 4 Other warning Frequency warning Only TSK 52HT TSK 62 132 SYS is flickered to HOT AIR TEMP ALM to SETTING TEMP in the ca...

Page 15: ...air generator is stopped at the time of the reverse connection of each temp sensor External sensor is included or perception of 15 C Only inside temp sensor is 10 C is flickered to HOT AIR TEMP displa...

Page 16: ...sales kansaidennetsu co jp Inquiry regarding the hot air generator Homepage www kansaidennetsu co jp or E mail...

Reviews: