3. Display Description and Operation Procedure
11
3.5 START
3.5.1 SINGLE, SEQUENCE, INTERVAL, REPEAT
Tap [START] on the main screen to start a
measurement in the setting configured in
3.4
MODE
and
3.6 CONFIG
.
z
If “START DELAY” is NOT checked in
“CONFIG” setting:
Upon tapping [START], the pump will begin
running. After the pump has run for 10 seconds to
stabilize, the measurement will begin.
z
If “START DELAY” is checked in
“CONFIG” setting:
Upon tapping [START] the Delay Time
configured in
3.9.2 CONTROL PANEL –
OPTION – START DELAY
begins. During the
last 10 seconds of that Delay Time the pump will
run to stabilize, after which the measurement will
begin.
Tap [STOP] to stop a measurement.
Tap
button while measuring to display a chart.
www.actoolsupply.com
www.actoolsupply.com