INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG
KANNAD 406 AF-COMPACT
PAGE: 211
FEB 01/2008
(2) Installation below the instrument panel
Figure 206: Installation of RC200 with mounting tray
Determine RC200 location below the instrument panel (be sure the
location meets the requirements established in RTCA-DO-204).
- According to the "area to be drilled" (1) of the mounting tray (3),
determine the location of the screws or rivets (2) used to secure the
mounting tray (3) to the instrument panel (4).
- Drill 2 holes on the mounting tray and on the instrument panel, diameter
depending on screws or rivets used.
- Secure the mounting tray (3) to the instrument panel (4).
- Secure the RC200 (5) to the mounting tray (3) with the 2 screws (6)
supplied (torque 0.8 Nm).
Figure 206: Installation of RC200 with mounting tray