User Manual BB100-073 ver 2
Page 16 of 20
9.2.1 Adjusting the tilt limit.
The tilt limit can be limited by moving down the Gas Spring holder bracket on the Pillar. Make
sure to tighten it properly.
A kit is available to modify the tilt range to be able to tilt the bed ± 17 degrees
9.3 Changing or adjusting a Side Rail or Corner
See spare part list for part numbers. The Side Rail Corners are screwed from the underside
with two (2) special plastic screws at each Corner. The holes in the Bed are oval allowing a
tight adjustment of the Side Rails and side walls. It is advisable to remove the screws at min
2 Corners to fit new Corners or Side Rails.
Do not use any other screws than Kanmed part no 700-0880 because they will not have
enough holding power. A screw can be screwed in and out about 6 times in the same plastic
hole.
9.4 Adding, removing or adjusting Storage Boxes or shelves
Loosen the screws to the Storage Box Holder. (if necessary remove the black decorative
plastic stripe). Move it to the new position and tighten the screws properly.
To remove or add an extra Box Holder: Raise the Pillar more that 5 cm. Press down the black
plastic frame that goes around the bottom of the Pillar. Now you can remove the bolt pins or
add bolt pins.
When adding Storage Boxes ensure that the Front Side Wall can be lowered sufficiently.
Cut the decorative black plastic stripes to fit. New stripes can be ordered at Kanmed.
9.5 Changing the Foot Pedal / electrical connections
Lay the Bed carefully on its side. Unplug the pedal from the Pillar. Unscrew the Foot Pedal
and replace it. Raise the Bed and check functions and that up / down arrows are indicating
correct.
9.5 1 Adding an extra foot pedal or front foot pedal
.
Please contact kanmed for necessary instructions and parts.
9.6 Changing the Pillar
Raise the Pillar electrically about 5 cm if possible.
Unplug power.
Empty the Bed and remove side walls and the Baby Tray.
Remove Storage Boxes. Press the plastic frame at the bottom of the Pillar down. Peel away
the plastic strips so that you can remove the metal pins that hold accessories to the Pillar. If
Pillar could not move then you will have to order new metal pins.
Remove Gas Spring from the Pillar as well as its bracket.
Loosen the bolts that hold the Bed Platform. These two bolts are lock tightened and loosening
them requires quality tools and strength. Observe the earth cable
Loosen the bolts on top of the Pillar to remove the Bed bracket. Observe the earth cable on
the underside.
Unplug the height control.
Turn the Pillar/Bed upside down.
Unscrew the earth potential stud connections.(Older models only)
Remove the earth protection cable under the Bed. (Older models only)
Loosen screws under the wheel base and remove the foot pedal.
Unscrew the Pillar. Observe the earth cable
To assemble
–
perform instructions in reverse order.
Make a full function check and an electrical safety test to ensure that the Bed Platform is
properly earthed.