NO GO ZONES FOR UNDERGROUND UTILITY SERVICES
No work is to commence on any worksite until you have checked if it contains underground
services. Here is how you can
fi
nd out.
• The “Dial Before You Dig” service (in Australia),
dial 1100
, provides free and easy access
to the records of a large number of organizations, including telecommunications, water,
electricity and gas.
• To see a list of organizations registered with the service or to log an enquiry electronically, visit
the Dial Before You Dig website at
www.dialbeforeyoudig.com.au
, or telephone 1100 (otherwise
consult with your local environment department).
If underground services are present, you must comply with the No Go Zones.
If the worksite contains or is suspected to contain ANY underground services, before any work
commences, you must follow the relevant No Go Zone safety procedures:
• No Go Zone safety procedures are available from all gas, water, telecommunications and
electricity companies.
• You must follow these safe systems of work at all times. If you cannot comply with these safety
procedures, then
NO
work shall be undertaken without written permission being received from
the utility company.
• The Kanga Loader and attachments must be kept a minimum distance of 2 meters from all
underground services.
MAINTAIN A MINIMUM OF 2 METERS DISTANCE FROM ANY UNDERGROUND SERVICE.
MINIMUM
2 metres
MINIMUM
2 metres
Summary of Contents for DW625
Page 1: ...PW628 DW625 MID RANGE LOADER OPERATORS MANUAL WWW KANGALOADER COM 1300 4 KANGA ...
Page 2: ...2 ...
Page 59: ...59 THIS PAGE IS INTENTIONALLY BLANK ...
Page 64: ...64 DIMENSIONS MID RANGE LOADER ...
Page 69: ......