
TARGET Connection -ISP
1)
Connect the programmer to the target system using the short
ribbon cable.
•
Target Layout
–
not end of lead view
•
Header is 0.1” (2.5
4mm) box header in 5 x 2 format, with
polarising notch - 10-way IDC header
•
See section below for
Six Way adapters
•
GND* These pins must be connected to target ground
•
GND One or both must be connected to Target ground