6.3.1 Connection to the pipe network
The flow and return connections are located as standard on the left side of the trench underneath the cover panel. Use the
punched pipe openings on the room side for the water-side connection. The convectors have a Eurocone valve connection.
Proceed as follows when connecting up the unit's hydraulic pipework:
Shut off the supply line from the heating medium.
Remove the punched pipe opening.
Connect up the pipework.
Using a suitable sealant (e.g. NEO Fermit), screw fit the connection accessories, e.g. thermostat valve and return fitting,
to the convector’s Eurocone valve connection.
Important! Use an appropriate tool (e.g. wrench AF 32) to prevent the union nut of the Eurocone valve from
shearing off and twisting. Ensure that the connections are installed tension-free!
Summary of Contents for Katherm QL 300
Page 2: ......
Page 16: ...Katherm QL Assembly installation and operating instructions 16 Overall length...
Page 17: ...Katherm QL Assembly installation and operating instructions 17...
Page 18: ...Katherm QL Assembly installation and operating instructions 18...
Page 36: ...Katherm QL Assembly installation and operating instructions 36 12 Certificates...