0.2 Inspections – C. Preventive Maintenance
Maintenance Manual Ottawa T2 4x2
0.2 Inspections
page
–
Every Day
Perform the inspections listed in the Daily Inspection Checklist
on page 7 and page 8.
At each inspection, add fluids and lubricants as indicated. Re-
pair all leaks. Replace cracked, damaged or worn parts.
page
–
Every 250 Hours of Operation
Perform the inspections listed in column A of the chart. Refer to
the Preventive Maintenance Forms on page 10 and page 11.
These service procedures must be performed after every 250
hours of operation or every month, whichever occurs first.
page
–
Every 500 Hours of Operation
Perform the inspections listed in column B of the chart. Refer to
the Preventive Maintenance Forms on page 10 and page 11.
These service procedures must be performed after every 500
hours of operation, or every three months, whichever occurs
first.
page
–
Every 1,000 Hours of Operation
Perform the inspections listed in column C of the chart. Refer to
the Preventive Maintenance Forms on page 10 and page 11.
These service procedures must be performed after every 1,000
hours of operation.
page
–
Every 2,000 Hours of Operation
Perform the inspections listed in column D of the chart. Refer to
the Preventive Maintenance Forms on page 10, and page 11.
These service procedures must be performed after every 2,000
hours of operation.
Summary of Contents for Ottawa t2
Page 1: ......
Page 47: ...38 0 8 Electrical Instruments 0 Machine Complete Maintenance Manual Ottawa T2 4x2 ...
Page 53: ...44 1 11 Start Stop 1 Engine Maintenance Manual Ottawa T2 4x2 ...
Page 55: ...46 2 Transmission Maintenance Manual Ottawa T2 4x2 ...
Page 57: ...48 3 Driveline Axle Maintenance Manual Ottawa T2 4x2 ...
Page 73: ...64 5 4 Diagnosis Hydrostatic Steering 5 Steering Maintenance Manual Ottawa T2 4x2 ...
Page 81: ...72 7 11 Diagnosis Boom 7 Load Handling Maintenance Manual Ottawa T2 4x2 ...
Page 83: ...74 8 Control System Maintenance Manual Ottawa T2 4x2 ...
Page 145: ...136 11 2 Safety 11 Common Electric Maintenance Manual Ottawa T2 4x2 Chassis Power Board ...
Page 153: ...144 12 5 Air Dryer 12 Common Pneumatics Maintenance Manual Ottawa T2 4x2 ...
Page 155: ...146 D Error Codes Maintenance Manual Ottawa T2 4x2 ...
Page 261: ...252 0 4 Fastener Torque Values F Technical Data Maintenance Manual Ottawa T2 4x2 ...