background image

INSTALLATION INSTRUCTIONS

Tuxedo™ Console Table 

1102264_2_B

Page 3 of 5

Questions?   Problems?   For additional assistance, please contact Kallista’s Customer

Service Department at 1-888-4KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.

 PRePARe THe SITe

1. 

Finished 

Floor    

Wall Bracing  

(2x6 minimum)

CL

 Finished

    Wall 

34”

31”

32”

Floor to top 

of Bracket

Mark the 

 anchor 

  holes.

 Console Table

 Bracket Anchor

 Holes  

 Foot  

 Anchor

 Holes 

CL

16-29/32”

13-29/32”

18-5/8”

 Foot  

 Anchor

 Holes 

1-7/16” 

 

‰

Rough-in the water supply lines and the drain piping.
Install a minimum of a 2x6 as a wall brace to provide support 

 

‰

for the wall bracket. The brace should be the same length as 

the console table, 36” and should be positioned 34” from the 

finished floor to the top edge of the board. The center of the wall 

brace should be in-line with the drain outlet.
Finish the wall.

 

‰

Mark the centerline on the floor and the wall.

 

‰

Mark the anchor holes for the console table mounting bracket 

 

‰

on the wall by holding the bracket up to the finished wall so that 

the center of the bracket lines up with the centerline. Mark the 

location of the anchor holes with a pencil.
Mark the location of the holes on the floor for the feet anchors.

 

‰

Drill a hole 1/4” D. x 1/2” deep, in the finished floor for each foot 

 

‰

anchor. The holes should be 18-5/8” from the wall and 13-29/32” 

from the centerline for the front legs and 1-7/16” from the wall 

and 16-29/32” from the centerline for the optional rear legs.

INSTALL THe MOUNTING BRACKeT

2. 

Console Table  

Mounting Bracket 

Install the console table mounting bracket to the finished wall with fas-

 

‰

teners suitable for your wall type.
Verify the table mounting bracket is level.

 

‰

Reviews: