2. Install the Drain Tubing
NOTE:
The same steps apply to both above-the-floor and
through-the-floor installations, but the tee is aligned differently.
Align as shown in the illustration.
Slide a coupling nut, then a gasket onto the overflow tube.
Slide a coupling nut, then a gasket onto the drain ell.
Align the overflow tube and drain ell with the tee. Align the tee
following the illustration for your style of installation.
Insert the tubes completely into the tee. If necessary, cut the
overflow tube to the correct length.
Align the tubes and tighten the nuts.
Slide a coupling nut, then a gasket onto one end of the tailpiece.
Insert the tailpiece into the trap inlet, with 1” (2.5 cm) to 2” (5.1
cm) inside the trap. The tailpiece may need to be cut for proper
fit.
Insert the tailpiece completely into the tee and tighten the nut.
Tighten the trap inlet onto the tailpiece.
Tee
Tailpiece
Overflow Tube
Gasket
Gasket
Coupling Nuts
Through-the-Floor Installations
Drain Ell
Tee
Tailpiece
Gasket
Gasket
Overflow Tube
Coupling Nuts
Drain Ell
Above-the-Floor Installations
Kallista
5
1040187-2-A