7
102206_Rev.A
Step 2 - Hand Shower Installation
Unscrew the
retainer nut
and remove the
washers
from the
hand shower base
.
Install the
hand shower base threaded tube
in the hole (fig.
2). Correctly align the
hand shower base
and fix in position
by screwing the
retainer nut
and
washers
on the
threaded
tube
. Tighten the
retainer nut screws
(fig. 2.1).
Insert a
rubber washer
at each end of the
hand shower
hose
.
Insert the
hand shower hose
through the
hand shower base
threaded tube
by the top. Screw the
hand shower
to the
hose
.
Insert a
rubber washer
in the
check valve
end and connect
the
check valve
to the
coupling
.
Connect the
hand shower hose
to the
check valve hose
.
Etape 2 - Installation de la douchette
Dévisser l’
écrou de retenue
et enlever les
rondelles
de la
base de la douchette.
Insérer le
tube fileté
de la
base de la douchette
dans le trou
prévu à cette fin (fig. 2). Aligner correctement la
base de la
douchette
et fixer en position en vissant les
rondelles et
l’
écrou
de retenue
. Resserrer l’
écrou
à l’aide des
vis
(fig. 2.1).
Insérer une
rondelle de caoutchouc
à chaque extrémité du
boyau
de la douchette
.
Passer le
boyau de la douchette
dans le
tube de la base de la
douchette
par le dessus du bain. Visser la
douchette
à l’extrémité
du
boyau
.
Insérer une
rondelle de caoutchouc
à l’extrémité de la
valve
anti-retour
et visser la
valve anti-retour
à l’
union
.
Visser l’extrémité du
boyau de la douchette
au
boyau
raccordé
à la valve anti-retour.
Fig. 2
Fig. 2.1
Summary of Contents for BF1219 CITE
Page 14: ...14 102206_Rev A Notes ...
Page 15: ...15 102206_Rev A Notes ...