background image

   

MO

N

ŽN

Í N

ÁV

O

D

 

    

   V

A

N

 

      

S  

PA

N

EL

EM

 

 

 
 
 

           

VÝŘEZY V POLYSTYRÉNOVÉM NOSIČI

 

CUTTING TO SIZE OF BATHTUB 
CARRIER 

COUPE DU SUPPORT DE LA 
BAIGNOIRE 

TAGLIO DEL SUPPORTO DELLA 
VASCA DA BAGNO 

CORTE A MEDIDA DEL SOPOR- 
TE DE LA BAÑERA 

CZ 

GB  
  F 

 

 

 

 

 

 

 

 

 

KONTROLA MONTÁŽNÍ POLOHY

  

 

INSTALLATION CHECK  

VERIFICATION DE LA SITUATION 
D’INSTALLATION  

VERIFICA DELLA SITUAZIONE DI 
INSTALLAZIONE  

COMPROBACIÓN DE LA 
SITUACIÓN DE MONTAJE  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

10  

Summary of Contents for DUO POOL 150 Series

Page 1: ...MONT N N VOD VANY S PANELEM Installation instructions Instructions d installation Instruzioni di montaggio Instrucciones de montaje...

Page 2: ...esm b t reprodukov na nebo kop rov na bez v slovn ho souhlasu firmy Kaldewei CZ GB F I E Vanu s panelem p epravujte jen v p epravn m obalu a vylu te nep im en zat en Za kody vznikl v d sledku nevhodn...

Page 3: ...rwise without the express approval of Kaldewei CZ GB F I E Transport the bathtub with panelling in its transport box only and avoid improper loads Kaldewei shall not assume any liability for damage in...

Page 4: ...ne autre mani re CZ GB F I E Ne transporter la baignoire avec rev te ment que dans l emballage de livraison et viter alors des charges non ad quates Kaldewei n assume aucune responsabi lit pour des do...

Page 5: ...ssa autorizzazione della Kaldewei CZ GB F I E Trasportare la vasca con rivestimento solo nell imballaggio originale edevitare qualsiasi sollecitazione che possa dan neggiarlo La Kaldewei declina quals...

Page 6: ...presa Kaldewei CZ GB F I E Transporte la ba era con revestimiento nicamente en el embalaje de suministro y procure no poner encima cargas pesa das Kaldewei no se responsabiliza de los da os originados...

Page 7: ...MONT N N VOD VANY S PANELEM CZ GB F I E 6...

Page 8: ...AISON VOLUMEDIFORNITURA ART CULOSINCLUIDOSENLA ENTREGA DUOPOOLMod 150 CZ GB F I E OBSAH DOD VKY SCOPEOFSUPPLY TENDUEDELIVRAISON VOLUMEDIFORNITURA ART CULOSINCLUIDOSENLA ENTREGA STUDIO Mod 826 STUDIO S...

Page 9: ...ECESSARI HERRAMIENTASNECESARIAS CZ GB F I E MONT P ED HRUBOU ST NU S OBKLADEM INSTALLATIONINFRONTOF THEBAREWALL TILING SITUATIOND INSTALLATION DEVANTUNMURBRUT A CARRELER SITUAZIONEDIINSTALLAZIONE DAVA...

Page 10: ...NCOIN DEJACARRELE DELASALLE SITUAZIONEDIINSTALLAZIONE INUNANGOLOGIA PIAST RELLATODELLASTANZADA BAGNO SITUACI NDEMONTAJEEN ESQUINASALICATADAS CZ GB F I E VYZNA EN POLOHY SIFONU DETERMINATIONOFSIPHON PO...

Page 11: ...RRIER COUPEDUSUPPORTDE LA BAIGNOIRE TAGLIODELSUPPORTODELLA VASCA DA BAGNO CORTEAMEDIDADELSOPOR TEDELABA ERA CZ GB F I E KONTROLA MONT N POLOHY INSTALLATIONCHECK VERIFICATIONDELASITUATION D INSTALLATIO...

Page 12: ...LAGE DU SUPPORT DE LA BAIGNOIRE INCOLLAMENTODELSUPPOR TODELLA VASCA DABAGNO ADHESI NDELSOPORTEDE LABA ERA CZ GB F I E USAZEN POLYSTYR NOB HO NOSI E ALIGNMENT OF BATHTUBCAR RIER ALIGNAGE DUSUPPORTDELA...

Page 13: ...IRE PREPARAZIONEDELLAVASCA DABAGNO PREPARACI NDELABA ERA CZ GB F I E USAZEN VANY A P POJEN SIFONU INSTALLATIONOFBATHTUB ANDCONNECTIONOFSIPHON MISE ENPLACE DE LABAIG NOIREETRACCORDEMENTDU SIPHON POSADE...

Page 14: ...VANY ALIGNMENTOFBATHTUB ALIGNAGEDELABAIGNOIRE ALLINEAMENTODELLAVASCA DABAGNO ALINEACI NDELABA ERA CZ GB F I E MONT PANEL FITTINGOFTHEPANELLING SYSTEM MISE ENPLACE DUREVETE MENT MONTAGGIODELRIVESTIMEN...

Page 15: ...OFTHEPANELLING SYSTEM MISE ENPLACE DUREVETE MENT MONTAGGIODELRIVESTIMEN TO COLOCACI NDELREVESTI MIENTO CZ GB F I E SP ROV N VANY JOINTING THEBATHTUB JOINTOIEMENT DELABAIG NOIRE RIFINITURA DELLE COMMES...

Page 16: ...216 155 02 2007 Franz Kaldewei GmbH Co KG Beckumer Stra e 33 35 59229 Ahlen Germany Tel 49 2382 785 0 Fax 49 2382 785 200 Internet www kaldewei com...

Reviews: