
POS DESCRIPTION
CODE
Q. POS DESCRIPTION
CODE
Q.
200 Box
066/90 1
210 Remote contr. Switch
CGE MC0A310AT1
032/90 1
201 Panel
069/90 1
211 Thermal relay CGE
MT03
053/90 1
202 Omega raceway
046/90 1
212 Fitting for cables PG9
213/90 1
203 Changeover
switch
VEMERCSO121177IPA
012/90 1
213 Socket
head screw
M4x8
2
204 Screw TCCC M4x14 DIN
7981
295/95 4
214 Screw TCCC M4x14
DIN 7981
295/95 4
205 Screw TCEI M4x6 DIN 912
120/95 3
215 Fuse blok PCH 1x38
FU2
093/90 1
206 Fuse carrier PCH 2x38 FU1
094/90 1
216 Fuse blok PCH 2x38
FU3
094/90 1
207 Contact emergency button
217 Transformer 20 VA
042/90 1
208 Emergency button
085/90 1
218 Handle button
1
209 Fitting for cables PG 13.5
215/90 2
219 Cover box
067/90 1
220 Electrical cable
016/77 1
221 Screw TCCC M4x14
DIN 7981
295/95 6
222 Screw TPSCEI M6x10
DIN 7991
249/95 2
Parts not visible on exploded
view
Tool set
N°4KM 0106/4
004/73 1
Fuse 10x38 1A
202/90 4
Fuse 10x38 2A
203/90 1
12. LAYING OFF AND DISMANTLING
12.1 LAYING OFF
If the machine is to be laid off or left idle for a long period, the following operations must be
carried out:
1. Disconnect the machine from the electricity mains.
2.
Empty oil from the gear box and cooling liquid from its tank.
3. Clean carefully the machine by getting rid of all traces of grease, especially on the
worked parts that must be protected with anti-oxidants.