background image

Operation Manual

AP-3

KAKA

®

Industrial

- 5 -

damaged according to the parts list or

part figure.

2.1.2 This machine should be mounted

on hard ground or specific stand (not

supplied).

2.1.3 Please leave plenty room around

the machine for your easy operating, in

order to avoid injury.

2.1.4

Please

remove

the

anti-rust

grease on processing surfaces and

some parts included with kerosene.

2.2 Caution

2.2.1 Please read this manual before

operation

and

make

yourself

understand its structure and principle

completely.

2.2.2 Please don’t operate the material

of size exceed the table list max. range.

2.2.3 Keep proper footing and your

body

balance. Force should be applied swiftly

and steady.

2.2.4 Please don’t touch the blade

during operation.

3. Operation and maintenance

This machine is pre-adjusted before out

of factory. When you want to use, rotate

the handle (#13) to drive the blade (#6) to

move up and down though gear (#12).

Before your operation, you can adjust bolt

(#5) and nut (#6), to make the balance of

the blade (#6) suited for the work piece.

PARTS LIST

Part No.

Description

Part No.

Description

1

Body

8

Work table

2

Sleeve

9

Conical pin

3

Screw

10

Screw M8X25

4

Nut M10

11

Gear

5

Bolt M10x35

12

Handle

6

Blade

13

Sleeve

7

Cover

Reviews: