
Page 13
For non-certification projects with a similar scenario as above, you will still want to prioritize
the regularly occupied spaces. However, you could reduce the number of monitors in the
space from three (3) to two (2) by removing the bottom monitor as this would still provide
great coverage of the regularly occupied areas.