KK1 Pro Single Pump Controller
11
/
13
Patented products, protected by law
Connection diagram of 220V single-phase power supply, motor and input
signal
The high level alarm FS is floating over other level sensor. When the high
level alarm FS touches, the pump will be started and an alarm will be issued.
High level FS and other level sensor will form a dual protection.
7.0 Air pipe connection
The standard configuration of the air pipe connection is 8/6mm hose joint.
When connecting air pipe, the controller shall be at the OFF state and the
air pipe shall be in the suspension non-pressure state in the entire process.
After connecting air pipe and the power supply is turned on, water can be
drained in a container! With the pressure mode available to control level,
drain the level below the air inlet each time to allow the air inlet in the
suspension state. It is recommended to enable the “Stop Delay” function
for this.
H
igh
L
eve
l
L
ev
el
S
tar
t
Air pressure
inlet
Pump
J2 Temp