Page 36
Garden Building
Installation Guide
Product Code : TGBv6.1 / November 2011
It will be easier to assemble the transom and
Victorian hip bars if all the M5 flange nuts
are removed from the double bolt retainers
(C9144) in the eaves beam (A5080) and
kept about your person for use as and when
you require them.
Double Bolt Retainer
Temporarily supporting the gazebo boss
(C9026) in the correct position. Slot the
holes at the bottom of the Victorian hip bar
over the M5 x 25mm bolts located in the
single bolt retainers which sit either side of
the eaves beam corner.
From the underside of the gazebo boss
(C9026) pass a double bolt retainer (C9144)
through the corresponding holes in the boss
and the Victorian hip bar.
(Please note that
M5 x 20mm roofing bolts (C8017) may
have been provided as an alternative
fixing).
Repeat this procedure until all the Victorian
hip bars are attached to the eaves beam
(A5080) and the gazebo boss (C9026).
Secure all bolts at the eaves and gazebo
boss using the M5 flange nuts.