INSTALL MOUNTING PLATE AND ANGLE IRON
1.
Fix the instruction paper onto the ceiling. Drill
holes as the paper show.
2.
Put the drywall anchors into the holes and pick out
the mounting plate and use 12 pcs mounting
screws to fix the plate onto the ceiling.(If for
concrete ceiling, pls use the 8 pcs of explode
screws).
3.
Put out the 8 pcs of angle iron, use 8 pcs of
mounting screws(4*14mm) with washers and nuts
to fixe 4 pcs angle iron onto the mounting plate.
4.
Adjust the height X of the chimney( as shown on
the picture 1), use 16 pcs of munting
screws(4*14mm) with washers and nuts to fixe the
other 4 pcs angle iron onto the angle irons which
have been installed.
INSTALL THE DUCTWORK
NOTE: To reduce the risk of fire, use only metal ductwork.
1. Deside where the ductwork will run between the hood and the
outside.
2. A straight, short duct run will allow the hood to perform most
efficiently.
3. Let the one side of the duct go outside through the hole of 6.7’’ as
shown.