1-20 (No.MB713<Rev.002>)
3.2.7 Loading board assembly (See Fig.4)
(1) Release one screw (S5).
(2) Unlock the loading motor (C2) from the hook (H1) on the
main base.
(3) Unlock two locking tabs (L6) and separate the loading
board assembly from the main base.
Fig.4
SECTION 4
ADJUSTMENT
This service manual dose not describe ADJUSTMENT.
Loading gear
Pully gear
Loading belt
Loading board assembly
Main base
Up/Down guide
Up/Down guide
Up/Down guide
Up/Down frame assembly
Up/Down guide
Main base
(L6)
(L4)
(L6)
(H1)
(C2)
(S5)
(L3)
(S4)
(S4)
(A)
(A)
(B)
(B)
(C)
FIG. (A)
FIG. (B)
FIG. (C)
Screw insertion
torque control
(A)
(L5)
(B)