Page 6
© JVA Technologies www.jva-fence.com
3. Mark the mounting pole. This is where the top of the U-bolt will be.
Slide the U-bolts over the pole and tighten when the top bolt aligns
with the previous marking.
4. Loosen the 6 bolts on the inside of the frame. DO NOT completely re
-
move these bolts. Lift the bottom of the solar panel until the attached
arms holding it are angled at 90 degrees. Tighten all 6 bolts again and
face the panel north.
Summary of Contents for PTE2705
Page 9: ...Page 9 JVA WA190 Overview...