●
If any part is missing or damaged, do not attempt to assembly this product, Contact customer service for
replacement parts.
●
Assembly should be performed on a flat, level, non-abrasive surface.
●
ESTIMATED ASSEMBLY TIME:
about 45 - 90 minutes.
STEP1: Connect and fix the 4 Support Bar – Lower (1) to Bottom Plate (14) and Plate Cover (8) by 32PCS M5
screws and washers(BB)
STEP 2:
Lay down tank housing, fix the Burner
Assembly (9) to Pate Cover (8) by 4pcs M5
Screws and Washers (BB).
!
!
!
!
!
!
6