Juralco VENETTE Manual Download Page 30

 Issue 2/19

  www.juralco.co.nz   ph (09) 478 8018

Juralco Venette™ Retractable Pleated, Insect Screen Systems

Page 30

Juralco Venette™

 Retractable Pleated, Insect Screens - 

 Powder Coating Care and Maintenance

Warning re use of solvents:

- In some cases strong solvents are recommended for thinning various types of paints and also for cleaning up mastics and sealants. 
- These can be harmful to the extended life of the powder coated surface, and must not be used for cleaning purposes.
- It is important to note that the damage will not be visible immediately and may take up to l2 months to develop.

If paint splashes or sealants and mastics need to be removed then the following may be safely used:
Methylated Spirits, Ethyl Alcohol, lsopropanol or preferably a mild detergent in warm water.

Joinery Protection during Installation:

All the activity on a construction site means that your  powder coated items
may get knocked or scratched, splattered with mortar,
plaster, textured coating or paint during the later stages of construction.
 
Please ensure that all powder coated articles are masked or covered at this time.
It is far easier to prevent accidents than to try and correct them. 
Should your joinery receive mortar or paint splashes see that these are removed
before cure and follow the instructions contained in this brochure.

“IMPORTANT ALL TRADES”

This valuable aluminium joinery will suffer

permanent damage from: plaster, mortar

and paint splashes - Protect if splashes

occur - Immediately wash down joinery

with water or meths - Do not allow

splashes to harden! ~ Do not use solvents!

- Do not remove this label until final clean

completed.

This photograph display damage that has occurred on site, post

installation. The photo of the masked joinery  displays clear signs

of damage that could have occurred were it not masked. Please ensure that

your joinery is protected right through the entire construction process.

External - Maintenance Program:

To extend the life of external powder coated articles and to comply with warranty
requirements for powder coated aluminium joinery, a simple, regular
maintenance program must be implemented.
The effects of ultra violet light, atmospheric pollution, dirt, grime and
airborne salt deposits will all accumulate over time and must be removed
or surface staining and weathering will occur, leading to an unsightly appearance.

For external coatings, cleaning should take place every six months. ln areas
where pollutants are more prevalent, such as beachfront houses and
industrial or geothermal areas, then a cleaning program should be carried
out on a more frequent basis ie. every one to three months.

Cleaning your powder coating

:

1. Carefully remove any loose surface deposits with a wet sponge.
2. Use a soft brush (non abrasive) and a mild household detergent (do
not use solvents) in warm water, remove dust, salt and other deposits.
3. Rinse off with clean fresh water.

Restoring weathered or scratched surfaces

:

Repair of Scuffed or Scratched surfaces 
Dulux Spray Cans are available in all colour card colours.
 
Repair of Small Scratches or Chips.
Dulux Dabsticks are ideally suited for the repair of small scratches. 
Dabsticks may not be available in all colour card colours.

Repair of Weathered areas .
Dulux Gloss Up is a light to medium cutting cream ideally 
suited for gloss restoration and has been specifically designed for this purpose. 
Gloss Up contains no waxes or silicone and is a one step system.

Typical sticker used to warn

other trades of the need to 

protect and mask off 

powder coated joinery

(applies to anodised joinery also)

Contact Dulux Powder Coatings , ph 0064 9 441 8244

Powder Coating  Maintenance

Powder Coating Installation Care

Summary of Contents for VENETTE

Page 1: ...Issue 2 19 www juralco co nz ph 09 478 8018 Juralco Venette Retractable Pleated Insect Screen Systems Page 1 JURALCO VENETTE RETRACTABLE PLEATED INSECT SCREEN SYSTEMS ISSUE 2 19...

Page 2: ...reen Systems Pages Covers Section 1 Venette Retractable Pleated Insect Screen Single Multiple Doors 3 4 General Showing typical component layouts 5 7 Materials All Extrusions and Components 8 9 Layout...

Page 3: ...Cap Wall Pro le 18 Bottom End Cap Sliding Bar 19 Bottom End Cap Wall Pro le 20 Top Guide Cap 21 Clip 22 Handle 23 Positive Magnet 24 Negative Magnet 25 PVC for Magnet 26 U Pro le 27 Top Guide 28 Wall...

Page 4: ...s 31 32 33 34 Rivet Intermediate Scorpion Tail Tube Joint for Tube 31 32 33 34 approx 120 25 38 34 38 60 Pro le Sections Max Dimensions Height 3000 max Width 2000 max Central Tubes and Mesh show 1R 1L...

Page 5: ...ROFILE Part No JPL 05 00002 51 34 SLIDING PROFILE Part No JPL 05 00012 TOP GUIDE 5 8m Part No JPL 05 00020 U PROFILE Part No JPL 05 00080 51 34 38 60 38 25 Mesh Pack Vertical Sides BUILD OUT ANGLE Par...

Page 6: ...d Part No JPL 05 13100 0 5 PVC Plate for Magnet Part No JPL 05 00070 0 5 End Cap Top sliding Bar Part No JPL 05 13040 0 5 End Cap Bottom sliding Bar Part No JPL 05 13050 0 5 End Cap Top fixed end Part...

Page 7: ...0 5 Tail Reverser Part No JPL 05 13170 0 5 Wire End Tail 3pc Yellow Part No JPL 05 13180 0 5 Wire End Tail Red Part No JPL 05 13130 0 5 Wire Part No JPL 05 13000 0 5 Build Out Frame Extrusions Compon...

Page 8: ...ose Installation can be reversed for RH or LH operation For both Height up to 3000max Door Open widths 1000min to 4000max Two Panels Centre close Three Panels End Close Installation can be reversed fo...

Page 9: ...Connections Clip on to this section to begin with Then Clip on to this section Five Panels Centre Close Installation can be reversed for RH or LH 3 2 combo operation ALL CONFIGURATIONS ARE REVERSIBLE...

Page 10: ...ut angle Part No J 7468 Build out cover Part No J 7469 Corner Stake for Build Out Part No JC 298 Corner Stake Build Out Angle and Cover Screws attaching Build Out Frame to Door Frame Attach Top Guide...

Page 11: ...ary must be no greater than 10mm out of parallel to oor 3 Attach Clips to the Wall with suitable SS fasteners 6 After cleaning the oor area attach Bottom Rail to the Floor with attached DS tape 4 Inse...

Page 12: ...ssembly and Installation Section 1 Doors Clips Clips Clips Clips Clips Side Close Single or Multiple Panel Screens This con guration does use a U pro le complete with Magnetic strip Install three Clip...

Page 13: ...g a screwdriver into the gap between the PVC and and sliding bar Remove the PVC strip by lifting it out THIS MST BE DONE FROM THE CENTRE OUT TO TOP AND BOTTOM If not you will break the Magnet Adjustme...

Page 14: ...screen door will be too difficult or too easy to open or close Ideally the wires should be firm but under no tension To check wire tension insert the tip of a screwdriver under the wire and pull gentl...

Page 15: ...or other organic solvents 3 Dry the Screen Door Unit After rinsing the Screen Door Unit dry all parts thoroughly Replacing the Screen Door Unit wet may a ect open close operation and make it easier to...

Page 16: ...inished Cassette Height and Width Dimensions Height max opening 3000mm Width Single Door Expanded max 1250mm This would give a max Compressed width of 105mm Width Single Door Expanded max 1500mm Mesh...

Page 17: ...eens Vertical Window General Juralco Venette Vertical Window Mesh Kits to suit Window opening sizes mm Height Range 420mm 1200mm Width Range Width Range 1201mm 1800mm 500 1000 A kit E kit 1001 1250 B...

Page 18: ...Retractable Pleated Insect Screens Vertical Window General Section 2 Vertical Window 1 Pull Bar 2 Top and Side Guides 3 Clips 4 Pile 5 Pull bar end cap Right 6 Pull bar end cap Left 7 Mesh pack Pro le...

Page 19: ...0 35 22 Pleated 22mm Vertical Window Mesh Units Maximum dimensions JPM 31 12500 4 5 1000mm high x 1200mm wide JPM 31 12510 4 5 1250mm high x 1200mm wide JPM 31 12520 4 5 1500mm high x 1200mm wide JPM...

Page 20: ...Components Section 2 Vertical Window Top Guide End Caps JPM 31 13590 0 5 Clips JPM 09 13050 2 5 Pull bar end cap LH JPM 31 13580 0 5 Pull bar end cap RH JPM 31 13570 0 5 Pile JRF98 10mm Top and Side G...

Page 21: ...chosen 1 Assemble the Frame 1 x Top Guide and 2 x Side Guides using 2 x Top Guide End Caps 2 Screw the Top and Side guides to the inside the Window frame using suitable SS screws Note Top guide and S...

Page 22: ...on Section 2 Vertical Window Starting with the Mesh Pack clipped and taped to the Top Frame ATTENTION Make sure that during this operation you do not cross the Puller cords Keep them apart and even 6...

Page 23: ...ec This Order for Venette Pleated Vertical Windows Height No identical Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Width Kit needed Enter Exact Overall Height and Width mm Min Max Height x Max Width Dimensions...

Page 24: ...magnet Clips Pull bar Top end cap Pull bar Bottom end cap Pull bar Puller cords Cord carrier Spring Cord block 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 F...

Page 25: ...19 2 19 15 1 5 BOTTOM TRACK Part No JPM 31 01020 2 5 MAGNET PROFILE Part No JPM 31 01050 2 5 Juralco Venette Retractable Pleated Insect Screens Horizontal Window Extrusions and Components Section 3 Ho...

Page 26: ...Caps Incl Wheel in place Top Guide End Caps JPM 31 13590 0 5 RH and LH For Bottom Guide Juralco Venette Retractable Pleated Insect Screens Horizontal Window Components Section 3 Horizontal Window Top...

Page 27: ...een with cutter or scissors Ensure all parts are clean tidy and are undamaged Unpacking Installation 3 After cleaning the Sill Base attach Bottom Track to the base using the DS foam tape 1 Assemble th...

Page 28: ...FLOWING 6 Adjust Spring Tensions 1 Gently peel the Magnet strip o from the Top and remove 2 3 Adjust tension for both Cord Blocks as necessary Do not over tension Should be just rm Clips Positive Mag...

Page 29: ...720 to 1300mm F kit 800 1000mm wide G Kit 1001 1250mm wide H Kit 1251 1500mm wide J Kit 1501 1800mm wide K Kit 1801 2400mm wide L Kit 2401 3000mm wide Specify PC Colour and Code Select Powder Coat Ty...

Page 30: ...displays clear signs of damage that could have occurred were it not masked Please ensure that your joinery is protected right through the entire construction process External Maintenance Program To ex...

Reviews: