Unpack and Mount an SSR120
IN THIS SECTION
Verify Parts Received with the SSR120 | 29
Register Products—Mandatory to Validate SLAs | 30
Mount an SSR120 on a Desk or Other Level Surface | 30
Mount an SSR120 on a Two-Post Rack | 31
Installing Antennas for the SSR120 Appliances that Support LTE | 33
Unpack an SSR120
The SSR120 is shipped in a cardboard carton and secured with foam packing material. The carton also
contains an accessory box and quick start instructions.
NOTE:
The SSR120 is maximally protected inside the cardboard carton. Do not unpack it until
you are ready to begin installation.
To unpack the SSR120:
1. Move the cardboard carton to a staging area as close to the installation site as possible, where you
have enough room to remove the components from the chassis.
2. Position the cardboard carton with the arrows pointing up.
3. Carefully open the top of the cardboard carton.
4. Remove the foam covering the top of the SSR120.
5. Remove the accessory box.
6. Verify the parts received against the lists in
.
28
Summary of Contents for SSR120
Page 1: ...SSR120 Hardware Guide Published 2022 01 17 ...
Page 48: ...3 Verify that all four Device interfaces are up 48 ...
Page 54: ...Lithium Battery Declaration 87 ...
Page 56: ...56 ...
Page 60: ...Restricted Access Warning 60 ...
Page 72: ...Unterminated Fiber Optic Cable Warning 72 ...
Page 78: ...Jewelry Removal Warning 78 ...