•
If you are adding the second-generation SRX5K-SPC-4-15-320 SPCs or the next-generation
SRX5K-SPC3 SPCs to a services gateway, the services gateway must already be equipped with
high-capacity power supplies and fan trays, and the high-capacity air filters. See
an SRX5800 Services Gateway from Standard-Capacity to High-Capacity Power Supplies” on
for more information.
During this installation procedure, you must shut down both devices, one at a time.
Replacing SPCs in an Operating SRX5400, SRX5600, or SRX5800 Services
Gateways Chassis Cluster
If your Services Gateway is part of an operating chassis cluster, you can replace the first-generation
SRX5K-SPC-2-10-40 SPCs with the second generation SRX5K-SPC-4-15-320 SPCs by incurring a minimum
downtime on your network. But when you are replacing the SRX5K-SPC-2-10-40 or SRX5K-SPC-4-15-320
SPCs with the SRX5K-SPC3 SPCs, there will be no downtime in your network.
NOTE:
SRX5K-SPC-2-10-40 SPC is not supported on SRX5400 Services Gateway.
To replace SPCs in a services gateway that is part of a chassis cluster, it must meet the following conditions:
•
Each services gateway must have at least one SPC installed. The installation may warrant additional
SPCs if the number of sessions encountered is greater than the session limit of one SPC.
•
If the chassis cluster is operating in active-active mode, you must transition it to active-passive mode
before using this procedure. You transition the cluster to active-passive mode by making one node
primary for all redundancy groups.
•
To replace first-generation SRX5K-SPC-2-10-40 SPCs, both of the services gateways in the cluster must
be running Junos OS Release 11.4R2S1, 12.1R2, or later.
•
To replace second-generation SRX5K-SPC-4-15-320 SPCs, both of the services gateways in the cluster
must be running Junos OS Release 12.1X44-D10, or later.
•
To replace next-generation SRX5K-SPC3 SPCs, both of the services gateways in the cluster must be
running Junos OS Release 18.2R1-S1, or later.
•
You must install SPCs of the same type and in the same slots in both of the services gateways in the
cluster. Both services gateways in the cluster must have the same physical configuration of SPCs.
•
If you are replacing an existing first-generation SRX5K-SPC-2-10-40 SPC with a second-generation
SRX5K-SPC-4-15-320 SPC, you must install the new SPC so that the second-generation
SRX5K-SPC-4-15-320 SPC is the SPC with the lowest-numbered slot. For example, if the chassis has
370
Summary of Contents for SRX 5800
Page 1: ...SRX5800 Services Gateway Hardware Guide Published 2020 02 10 ...
Page 23: ......
Page 30: ...Figure 2 Rear View of a Fully Configured AC Powered Services Gateway Chassis 31 ...
Page 111: ...LEDs 112 ...
Page 121: ...Port and Interface Numbering 122 ...
Page 127: ...Port and Interface Numbering 128 ...
Page 161: ......
Page 179: ... One SRX5K MPC IOC2 Modular Port Concentrator with two Modular Interface Cards MICs 180 ...
Page 180: ... One SRX5K 40GE SFP I O card IOC 181 ...
Page 205: ......
Page 261: ......
Page 324: ...c Upload the configuration to RE2 from the USB device 325 ...
Page 365: ...Figure 143 Installing an SPC 366 ...
Page 367: ...368 ...
Page 422: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5800 425 ...
Page 423: ......
Page 457: ......
Page 473: ...475 ...
Page 476: ...Restricted Access Area Warning 478 ...
Page 483: ...485 ...
Page 496: ...Jewelry Removal Warning 498 ...
Page 499: ...Operating Temperature Warning 501 ...
Page 509: ...DC Power Disconnection Warning 511 ...
Page 513: ...DC Power Wiring Sequence Warning 515 ...
Page 516: ...DC Power Wiring Terminations Warning 518 ...
Page 519: ...DC Power Disconnection Warning 521 ...
Page 523: ...DC Power Wiring Sequence Warning 525 ...