![JUNGLE HOBBIES LL-4800N Quick Start Manual Download Page 10](http://html1.mh-extra.com/html/jungle-hobbies/ll-4800n/ll-4800n_quick-start-manual_2032081010.webp)
Figure II
LL-4800N
LL-4800N
LL-4800N
LL-4800N
LL-4800N
A (Master)
E (Slave)
D (Slave)
C (Master)
B (Slave)
IN
OUT
IN
OUT
IN
OUT
IN
OUT
IN
OUT
Case
2
-
Step1
)
If
“A”
fixture
and
“C”
are
as
masters
and
others
are
slaves
,
”OUT”
ethernet
port
of
A
fixture
should
be
connected
to
IN
ethernet
port
of
B fixture
by
the
network
cable
.
Then
,
”OUT”
ethernet
port
of
B
fixture
should
be
connected
to
“IN”
ethernet
port
of
“C
”
fixture
.
(Refer to figure II below.)
Step2
)
Lastly
,
press
IN
for
all
of
slaves
with
the
remote
controller
and
they
will be ready to receive signals from the masters.
Step3) Now, you can adjust time, lighting mode, or other settings from masters In
this
situation
,
“B”
fixture
will
be
controlled
by
“A”
fixture only
.
“D”
and
“E”
fixtures
will
be
also
controlled
by
“C”
fixture
only
.
The PAR measurements for LL-4800N measured in micromoles (ìmol) per meter sq per second.
PAR measurement
10
Photosynthesis is driven by PAR
0 - 2 0 0
2 0 1 - 4 0 0
4 0 1 - 6 0 0
6 0 1 - 8 0 0
8 0 1 +
CM/
INCH
CM/
INCH
2
0
C
M
/7
.9
IN
C
H
CM/
INCH
4
0
C
M
/1
5
.7
IN
C
H
6
0
C
M
/2
3
.6
IN
C
H
0
60
40
20
20
40
60
8
8
16
16
24
24
0
5/1.9
5/1.9
15/5.9
15/5.9
25/9.8
25/9.8
0
60
40
20
20
40
60
8
8
16
16
24
24
0
5/1.9
5/1.9
15/5.9
15/5.9
25/9.8
25/9.8
0
60
40
20
20
40
60
8
8
16
16
24
24
0
5/1.9
5/1.9
15/5.9
15/5.9
25/9.8
25/9.8
18
17