
Seite 9
v1.0
30.05.2022
Public
4.
Mounting and Handling
WMT 210
WMT 215
4.1
VESA75 Interface
VESA75 hole pattern according to illustration, position 4.
-
Horizontal and vertical distance between the screw holes: 75 mm
-
Thread: M6, torque: 8 Nm (recommended)
-
Screw-in depth in the threaded bushings: max. 6 mm
4.2
U-Mount Interface
Mount the retaining bracket (see illustration, position 6) on the device using the screws supplied in the
following order from the inside to the outside:
Nord-Lock washer -> bracket -> Nord-Lock washer -> Allen screw (SW 6 mm) -> cover cap.
4.3
Opening the service slot
NOTE
The relevant safety measures must be observed at all times when handling electrostatically haz-
ardous components. (DIN EN61340-5-1 / DIN EN 61340-5-2).
Remove the 6 screws of the service slot cover (see illustration, position 5) with a Torx Tx10 screw-
driver.
Remove the service slot cover from the device.