![Jumpking JK1015RC User Manual Download Page 22](http://html1.mh-extra.com/html/jumpking/jk1015rc/jk1015rc_user-manual_2031411022.webp)
STEP 4 :
FITTING THE FRAME PAD
This step will require 2 people.
Lay the frame pad
- Part L
out over the edge of
the frame with the ties facing downwards.
Align the openings in the frame pad with the
T-cowelded tube’s on the frame.
The frame pad is now
and you have
completed step 4.
WARNING:
The trampoline
MUST NOT
be used
during construction.
A
B
C
Frame Pad
Frame Pad
Frame Pad
Top tube
Top tube
Top tube
Webbing
Webbing
Webbing
D-ring
D-ring
D-ring
Look under the trampoline and locate the pairs
of straps near the edge of bed and Double
D-ring and webbing near the frame.
See the inset drawing. A, B and C. Repeat this
step with the remaining straps (not shown).
L
Summary of Contents for JK1015RC
Page 2: ......
Page 3: ...10 ft x 15 ft Rectangle Trampoline Enclosure...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ...100 kg 220 lbs...
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 27: ...8 S...
Page 29: ...100 kg 220 lbs...