31
5 Functional test
After the paperless recorder has been installed and wired up, it can be
commissioned. After applying or switching on the supply voltage, the start-up
screen will appear for a short time.
Start-up screen
The visualization will start automatically after the initialization phase.
Visualization
The paperless recorder is now in the recording phase.
Further steps
A
The recorder can be configured by an authorized person, either by
using the touchpad (turn and touch with one finger) or with the
help of the PC setup program.
Further information about configuration can be found in the
Operating Manual B 706581.0.
Finally, make another check that the connection, configuration and
function of the recorder are all correct.
Summary of Contents for 706581/18-321-33/020,444
Page 2: ......
Page 4: ...Contents 9 Index 43 ...
Page 10: ...1 Introduction 10 ...
Page 14: ...2 Identifying the instrument version 14 ...
Page 30: ...4 Electrical connection 30 ...
Page 32: ...5 Functional test 32 ...
Page 37: ...37 7 Declaration of Conformity ...
Page 38: ...7 Declaration of Conformity 38 ...
Page 39: ...39 8 Type Examination Certificate ...
Page 40: ...8 Type Examination Certificate 40 ...
Page 41: ...41 8 Type Examination Certificate ...
Page 42: ...8 Type Examination Certificate 42 ...
Page 45: ......
Page 46: ......
Page 47: ......