5
4
NOTE: Remove any transit protection material
1. Feed tube (9) through base (10+14) with the welded
plate against the top of the base.
2. Screw (12) through washer (11) and base (10+14) and
into pole (9) tighten firmly. Stand upright on base.
3. Place tube (8) onto tube (9) and fix in place with
screw (4).
4. Loosen collar (6) and slide tube (5) out of tube (7) and
extend to its full length. Tighten collar (6).
5. Place tube (7) on to tube (8) and fix in place with
screw (4). Stand is complete.
6. Place assembled heater head (1) onto tube (5) and fix in
place with screw (13).
7. Clip the fitted power cord into the cord clips (3).
8. Slide the back off the remote and fit 2 x ‘AAA’ batteries
(not supplied). Slide back onto the remote.
Heater is now complete and ready for use.
TO TILT HEAD
Note: Always ensure that the floor heater is
switched off, disconnected from the mains power
supply and is cold to touch. If heater has been
recently used, please leave the floor heater one (1)
hour to cool before tilting head.
1. Loosen the head tilt screw, do not remove.
2. Head can be tilted through 25°.
3. Tighten the head tilt screw when the desired angle is
achieved.
Stand assembly
Head Tilt Screw
Head Tilt Screw
Assembled Head
Off
On
1.8m C
ompleted heigh
t on stand