background image

ENGLISH

5

ENGLI SH

DESCRIPTION

Supplied parts

1 cover
26 studs
26 screws
26 nuts
Approx. 8 m elastic line

OPERATION

1.

Drill, if necessary, holes at regular intervals in the wall of the trailer.

2.

Screw the studs to the trailer wall with the screws and nuts. Make sure the screw unions are
properly tightened.

3.

Place the cover on the trailer and insert the elastic line through the eyes.

4.

Press the clips together and tie knots on
both ends of the line.

5.

Stretch the line over the studs.

Subject to printing errors and design changes over which we have no control. In the event of problems,
please contact our service department.
www.jula.com

Reviews: