background image

18

JUDO i-soft@home 5

Operation

5.4.4 Desired water hardness set-

ting limitations

The water softening system control unit
checks if the desired water hardness is cor-
rectly set.

1. Limitation due to the mixing valve

setting range:

The desired water hardness can be set be-
tween 1 °dH and half the value of the un-
treated drinking water ha2 °dH.
Example: Untreated drinking water hard-
ness = 18 °dH
Desired water hardness setting:
1 to 11 °dH
The desired water hardness cannot be set to
a higher value.
The maximum hardness that can be set via
the menu with the 

 key is limited to the val-

ue calculated by the control unit. Higher val-
ues are not possible.

2. Limitation due to the maximum value

for sodium in the drinking water:

After the softening, the sodium concentra-
tion in the mixing water increases, depend-
ent on the raw water hardness and the set
desired water hardness.
According to current national drinking water
legislation, the limit value for sodium in
drinking water is 200 mg/l. Mineral and table
water are not affected by this. Their limit val-
ues are much higher, partially greater than
1000 mg sodium per litre.

If the calculated total sodium content ex-
ceeds the valve permitted by the drinking
water legislation of 200 mg/l, then it can be
corrected by increasing the desired water
hardness.
Based on the raw water hardness and de-
sired water hardness, the electronics deter-
mine the sodium content. The electronics do
not take into account the sodium content of
the raw water. If the limit value of the drink-
ing water ordinance is exceeded, the follow-
ing messages appear on the display:

Calculation of the sodium content

°dH

Raw water hardness (ask
the water supply company
or measure with hardness
measuring instrument)

-

°dH

Residual hardness (meas-
ured value)

=

°dH

Difference in water hardness

×

8.2 mg Na

+

/l × °dH

Na ions exchange value

=

mg/l

Increase of the sodium con-
tent by softening

+

mg/l

sodium already present in
the raw water (ask the water
supply company)

=

mg/l

Total sodium content in the
mixing water

Example calculation of the sodium con-
tent

20 °dH

Raw water hardness

- 8 °dH

Residual hardness

= 12 °dH

Difference in water hardness

× 8.2

 

= 98 mg/l

Due to softening:

+ 10 mg/l

From water supply company

= 108 mg/l

In total

Attention!
Sodium limit val

Summary of Contents for 8203041

Page 1: ...Read before use and store Installation and operating instructions JUDO i soft home 5 Fully automatic water softening unit Valid for EU countries and Switzerland Language English ...

Page 2: ...dence you have shown in us by purchasing this device In purchasing this fully automatic water sof tening system you have procured a state of the art device This device is suitable for use in cold drinking water up to a maximum water and ambient temperature of 30 C Every device has been carefully checked prior to supply Nevertheless if difficul ties occur please contact your responsi ble customer s...

Page 3: ...JUDO i soft home 5 3 ...

Page 4: ...description 21 5 7 Filling with salt 22 5 8 Leakage alarm 22 5 9 Potential free signal relay 25 5 10 Integration of the water softening system in building control systems 25 5 11 Connectivity module accessory 25 5 12 Conversions changes spare parts 26 5 13 Maintenance repair 26 5 14 Interruption of operation 26 5 15 Resetting to factory setting 26 5 16 Overview of the display messages 27 6 Fault 2...

Page 5: ...who are able to fulfil the instructions referred to in the installation and operating instructions as well as country specific regulations Alongside the operating instructions and the legal regulations applicable in the country and place of use in respect of accident pre vention the recognised technical regula tions for safe and professional work must be observed Therefore these operating instruct...

Page 6: ...opean Drinking Water Direc tive The manufacturer supplier must be consult ed before using water of a different quality or water with additional additives The water softening system is suitable for use in cold drinking water up to a maximum ambient temperature of 30 C It is manufactured according to the state of the art and recognised German safety regu lations The water softening system may only b...

Page 7: ...m is not regularly serviced the softening function can be im paired NOTICE see chapter 1 2 Safety instructions and dangers due to non observation Where the water pressure is greater than 7 bar a pressure reducer must be installed upstream of the water softening system see fig 2 If the operating pressure is great er than 7 bar malfunctions can occur The optimum operating pressure for the wa ter sof...

Page 8: ...d cleaning agents reduced 3 2 Materials used The materials used are resistant to the phys ical chemical and corrosive loads expected to be encountered in drinking water and fulfil the specifications required by DIN EN 14743 and DIN 19636 100 Water sof tening systems cation exchangers in drink ing water installations All materials are hy gienically and physiologically harmless Plastics fulfil the K...

Page 9: ...precisely followed If the waste water cannot be safely and completely drained it is possible that property damage to the home and fur nishings may be caused by the water A shut off valve must be installed up stream and downstream of the water softening system This allows the water supply to be disconnected for water sof tening system maintenance repairs or in case of malfunction Likewise flooding ...

Page 10: ...w This is indicated by an arrow integral with the casting see fig 3 The flange surface of the rotary flange fitting must be upright The rotary flange fitting must be fitted so that it is free from mechan ical stress or strain Otherwise mechanical damage of the rotary flange fitting may re sult This can result in severe water dam age Therefore when installing ensure that no large forces act on the ...

Page 11: ...rformed so that de pendent on the local circumstances the hand wheel can be easily accessed 4 2 3 Installation of the support ele ments The bracket set 2 brackets with one pipe clamp each is screwed to the wall with 4 hexagon head screws Notes on installing the wall support contain er support are included in the correspond ing installation instructions Fig 4 Bypass valve JQX Fig 5 Profile flange s...

Page 12: ...al must point towards the parallel connection flange If this is not observed water leaks may oc cur This can result in water damage to the building furnishings and equipment Raise the water softening unit and swivel approximately 30 in an anti clockwise direction Position the water softening unit on the parallel connection flange so that the screw heads project through the bayonet holes see fig 8 ...

Page 13: ...irection up to the stop The salt reservoir can be placed below the water softener or next to it on the floor Fig 9 Connection of the water softening system with the salt reservoir 1 2 Marking arrow unlocked Marking arrow locked Lance Salt reser voir Note the marking arrow In doing so the arrow must point to the side see fig 9 Note the marking arrow The arrow must now point to the front side of the...

Page 14: ...r hose with 11 mm outside diameter must not be routed any higher than the control head The hose length must not exceed 3 m The safety overflow hose with 19 mm out side diameter must be routed with a steady downward slope to the water trap If a steady downward slope to the water trap cannot be achieved at the location of instal lation then a saltwater resistant pumping system must be installed to c...

Page 15: ... individual values are in creased or decreased using keys and and then accepted using the OK key Sub menus Regeneration manual regeneration start see chapter 5 4 2 Manually starting regen eration of the water softening system Leakage alarm Only visible if the leakage alarm is activat ed For activation see chapter 5 8 1 Start sleep mode Fig 11 Water softening system control panel Access to the main...

Page 16: ...ions software version hard ware version the date for the next neces sary maintenance intervention and the cur rent instantaneous water flow 5 4 Start of operation To shorten commissioning fill approxi mately 5 litres of water into the salt res ervoir until just above the intermediate bottom Fill 25 50 kg of regenerating salt into the salt reservoir The regenerating salt must as a minimum comply wi...

Page 17: ...us again see fig 13 5 4 3 Setting the desired water hardness The water softening system is pre set to a desired water hardness of 8 dH Another desired water hardness is set as follows Press key The display shows the fol lowing Use the key to reduce the desired water hardness set and the key to increase it The step size is 1 dH The desired water hardness value chosen is saved by pressing OK The des...

Page 18: ...ffected by this Their limit val ues are much higher partially greater than 1000 mg sodium per litre If the calculated total sodium content ex ceeds the valve permitted by the drinking water legislation of 200 mg l then it can be corrected by increasing the desired water hardness Based on the raw water hardness and de sired water hardness the electronics deter mine the sodium content The electronic...

Page 19: ...s can be adapted as follows Press the key 1x and then 2x The display shows the following Press key OK 1x and then key as often as necessary until the display indicates the following Press the OK key The display shows the following Use the key to reduce the measured re sidual hardness value and the key to in crease it The step size is 1 dH The chosen residual hardness setting is saved by pressing O...

Page 20: ...20 JUDO i soft home 5 Operation 5 5 Menu structure Fig 14 Menu structure ...

Page 21: ...he soft water volume is precisely meas ured using a water meter in the system s soft water pipe and in this way triggering of re generation is controlled Regeneration is performed according to DIN EN 14743 and DIN 19636 100 using miser salting Disin fection of the system takes place at regular intervals to prevent microbe contamination The small quantity of chlorine required for this is created el...

Page 22: ...e menu the set salt re serve can be corrected if necessary This menu can also be accessed after pressing M and selecting Settings Refill Quantity If the salt is only replenished once the salt reserve is completely used up the brine lev el may temporarily increase The suction process then lasts correspondingly longer If there is no longer any regenerating salt available or if the regenerating salt ...

Page 23: ...arden sprinkling filling up of a swimming pool or garden pond Press key 1x and then key 1x The display shows the following Press the OK key The display shows the following After pressing the OK key sleep mode starts The display shows the following alternating with The time indication displays the remaining period in hours Pressing the OK key will exit the sleep mode Otherwise the leakage alarm wil...

Page 24: ...he maxi mum water volume set for another limit value is reached The limit values must be set according to the respective consumption habits If under the normal consumption habits a limit value is regularly exceeded without a leak being pre sent the corresponding limit value can be reset to a larger value Typical adjustment values for a private household Main menu Settings Setting Leakage alarm Lim...

Page 25: ...s the following Press the OK key The display shows the following Press key or to change between Nor mally closed and Normally open The chosen setting is saved by pressing OK 5 10 Integration of the water softening system in building control systems The water softening system can be integrat ed via the potential free relay into a building control system e g EIB LCN or LON For example the potential ...

Page 26: ...in a dry and frost free location The connection flange must be protect ed against dirt and damage Once the water softening system is fitted and started again it must be flushed and regenerated see chapter 5 4 Start of operation 5 15 Resetting to factory setting All customer settings e g desired water hardness and residual hardness correction can be reset to the factory setting in the fol lowing wa...

Page 27: ...age appears if the calculated salt reserve falls below 5 kg see chapter 5 7 Fill ing with salt Attention Salt deficit Message appears after exceeding of the minimum chlorine flow see chapter 5 7 Fill ing with salt Attention Sodium limit val This message appears if due to raw water hardness and the desired water hardness setting the sodium limit value stipulated in the drinking water ordinance is e...

Page 28: ...stic parts resulting in embrittlement and even breakage Therefore do not use these types of cleaner Indication on the display Cause Remedy Attention Error Reg Drive Regeneration drive defective Notify customer service Unplug the pow er supply unit If fitted switch the bypass valve to bypass Attention Error Salification Salting process de fective container overfilled or leak Check the brine level i...

Page 29: ...quality ac cording to DIN EN 973 When replenishing the salt take appropriate hygiene measures Thus for example the salt packs should be cleaned before use so that no impurities can get into the salt dissolving container The re generating salt must be shaken into the salt dissolving container directly after undoing the packaging In doing so ensure that the salt dissolving container is not overfille...

Page 30: ... dwelling units 3 6 Operating weight with full salt charge approx 180 kg Shipping weight approx 80 kg Nominal flow rate as per DIN EN 14743 at 1 bar pressure loss 3 8 m h Nominal flow rate with a hardness reduction from 20 dH 360 ppm CaCO3 to 8 dH 140 ppm CaCO3 5 3 m h Nominal capacity 2 4 mol Salt supply tanks content 100 kg Volume of the exchanger res in approx 12 l Water consumption per re gene...

Page 31: ...a JUDO JULIA dosing pump in the mixing water pipe downstream of the water softening system so that the water can be admixed proportionally with a JUL mineral solution The JUL mineral solutions contain sub stance components that stabilise the remain ing carbonate hardening components and create the conditions for formation of a ho mogeneous protective layer in the down stream pipe system These subs...

Page 32: ...32 JUDO i soft home 5 Data sheet Fig 16 Electronic control unit with fault message relay Setting the switching function See chapter 5 9 ...

Page 33: ...JUDO i soft home 5 33 Spare parts 10 Spare parts Fig 17 Spare parts JUDO i soft home 5 1 A 2 4 3 B 10 QR code 6 10 8 11 7 9 9 8 ...

Page 34: ...ity sensor and intake strainer 2201382 82 Wear part set Pressure regulator 2200582 88 Spare part set Injector 2201470 78 A Spare part set Hoses complete 2200012 25 B Spare part set Overflow connection 2202230 38 1 Power supply unit 24 V DC export 2210560 65 2 Lance 2202006 190 3 Cover of salt reservoir 2201480 35 4 Salt reservoir 2201986 350 6 Electronic control unit 2201875 315 7 I O module 2 16 ...

Page 35: ... 20 0 16 7 286 2 86 17 30 3 21 3 17 7 303 3 03 18 32 1 22 5 18 8 321 3 21 19 33 9 23 8 19 8 339 3 39 20 35 7 25 0 20 9 357 3 57 dH f e gpg ppm CaCO3 mmol l 21 37 5 26 3 21 9 375 3 75 22 39 3 27 5 22 9 393 3 93 23 41 1 28 8 24 0 411 4 11 24 42 8 30 1 25 0 428 4 28 25 44 6 31 3 26 1 446 4 46 26 46 4 32 6 27 1 464 4 64 27 48 2 33 8 28 2 482 4 82 28 50 0 35 1 29 2 500 5 00 29 51 8 36 3 30 2 518 5 18 3...

Page 36: ...raufbereitung GmbH Filiaal Filiale BeNeLux Laarbeeklaan Av du Laerbeek 72 A1 B 1090 Brussel Bruxelles Tel Tél 32 0 24 60 12 88 Fax 32 0 24 61 18 85 e mail info benelux judo eu judo eu JUDO France S à r L 76 Rue de la Plaine des Bouchers Technosud F 67100 Strasbourg Tel 33 0 3 88 65 93 94 Fax 33 0 3 88 65 98 49 e mail info judo fr judo fr Installed by JUDO ECO SAFE The leakage protection to be comb...

Reviews: