32
JUDO i-soft@home
Data sheet
9.3
Installation dimensions
9.4
Scope of supply
– Water softening unit
– Salt reservoir
– Rotary flange fitting JQE 1"
with screw connection
– Bypass valve JQX
– Safety overflow hose and waste water
hose
– Water trap with attachment
– Wall support
– Installation and operating instructions
9.5
Accessories
– Connectivity module
(order no. 8235010)
– WLAN repeater (order no. 2202228)
– Floor sensor for leakage alarm
(order no. 8203554)
9.5.1 Protective measures to pre-
vent corrosion
For water with water hardness 0 °dH, plastic
pipes or corrosion-resistant pipes should be
laid.
For water with partial softening (about
8 °dH), galvanised pipes and copper pipes
can be laid.
Our recommendation:
Installation of a JUDO JULIA dosing pump in
the mixing water pipe downstream of the
water softening unit, so that the water can
be admixed proportionally with a JUL miner-
al solution.
The JUL mineral solutions contain sub-
stance components that stabilise the remain-
ing carbonate hardening components and
create the conditions for formation of a ho-
mogeneous protective layer in the down-
stream pipe system. These substance com-
ponents correspond in the prescribed type,
quality and quantity to section 11 of the cur-
rent German Drinking Water Act (“Treatment
substances and disinfection processes”).
Fig. 15: Installation dimensions
A
195 Installation length (rotary flange)
B
390 Device width
C
165 Height above the pipe middle
D
465 Height below the pipe middle
E
385
Installation depth up to the pipe
middle without JQX
E1
450
Installation depth up to the pipe
middle with JQX
F
370 Height of the overflow connection
H
240 Maximum distance between wa-
ter softener and salt reservoir
K
390 Width of the salt reservoir
L
435 Depth of the salt reservoir
with overflow
M
600 Height of the salt reservoir
Sewer connection necessary
All dimensions in [mm] (see fig. 15)