Product information
2.4
Approval marks
The device complies with the technical
regulations for drinking water installation
according to DIN EN 806ff. and the national
supplement DIN 1988ff. as well as DIN EN
1717.
It has been tested and certified by the
DVGW (Deutsche Vereinigung des Gas-
und Wasserfaches e. V. - Technisch-wis-
senschaftlicher Verein) in accordance with
the requirements
• of the DIN EN 13443-1 and DIN 19628
for mechanically active filters.
The device bears the DIN-DVGW mark as
proof of certification.
3
Installation
CAUTION
The device may only be installed
by qualified technical personnel.
Installation of the device upstream of the
domestic water meter is forbidden.
3.1
Conditions
CAUTION
Risk of property damage or water
damage!
The pipe must be able to safely
support the device (weight: see
chapter 7). If necessary, the pipes
must be provided with additional
fastenings or support.
To ensure convenient operation and main-
tenance of the device, always adhere to the
specified clearances in chapter 3.4.1.
3.1.1 Requirements for the place of
installation
CAUTION
The installation room must be dry
and free from frost.
The ambient temperature must not
exceed 30 °C! In higher temper-
atures or direct sunlight, mater-
ial damage may occur up to and
including breakage of device parts.
An adequately sized waste water
connection (e.g. floor drain) in
compliance with DIN 1986 must be
provided.
3.2
Installation of the rotary
flange fitting
CAUTION
The flange surface of the rotary
flange fitting must be upright!
The rotary flange fitting must
be fitted so that it is free from
mechanical stress or strain. Oth-
erwise mechanical damage to the
pipe or the rotary flange fitting up
to and including breaks can result.
The built-in rotary flange serves as a con-
necting element between the domestic
water installation and the device.
It consists of:
•
rotary flange fitting
•
profile flange seal
•
two union nuts
•
two pipe sockets
•
two flat seals.
8
JUDO JSY-LF
1701428 • 2022/01