background image

Installation

3.5

Commissioning

Prior to initial commissioning (or to com-

missioning after maintenance work) fill the

installed device with water and vent:

1.

Open the upstream shut-off valve to

fill the device with water. The device is

now under mains pressure.

2. Attention:

 Carry out a backwashing

immediately so that the trapped air can

escape (see chapter 4.1.2)! This pre-

vents damage to the installation by

water hammer pressure surges.

After backwashing, the device is vented

and ready for operation.

4

Operation

4.1

Cleaning of the sieve insert

(backwashing)

A regular cleaning process is necessary to

remove the residues from the sieve fabric

of the device. This process is called 

back-

washing

.

Suction pipes are provided for backwash-

ing, which rotate around the sieve fabric

of the fine filter. The backwashing valve

opens on the bottom side of the device. By

reversing the water flow from inside to out-

side, deposits on the sieve fabric are car-

ried away and rinsed out with the back-

wash water. The suction pipes also clean

the inside of the transparent filter bowl with

wiper lips during their movement.
The degree of contamination and cleaning

process can be observed from the outside.

INFO_NO_HEADER

The device is backwashed with

filtered water. The filtered water

supply of the domestic installation

remains intact during the backwash-

ing process. No dirty water can reach

the pure water side during the back-

washing.

4.1.1 Backwashing interval

If cleaning is not performed soon enough,

the result may be damage to the sieve

insert. Large quantities of filtered particles

can deform the sieve fabric and in extreme

case lead to tearing of the sieve fabric. In

addition, larger deposit quantities can impair

the backwashing function mechanically.
According to DIN EN 13443-1 backwashing

the device is required at the latest every six

months.

The manufacturer recommends a back-

washing:

12

JUDO JSY-LF  

1701428 • 2022/01

Summary of Contents for 8070558

Page 1: ...Installation and operating instructions JUDO SPEEDY LONGLIFE Backwash protective filter 2 Valid for EU countries and Switzerland Language English Read before use and store...

Page 2: ...nting even in excerpt form is only per mitted with special approval Dear customers Thank you for the confidence you have shown in us by purchasing this prod uct You have purchased a state of the art d...

Page 3: ...tary flange fitting 8 3 3 Installation of the device 9 3 4 Draining of the backwash water 10 3 5 Commissioning 12 4 Operation 12 4 1 Cleaning of the sieve insert backwashing 12 4 2 Conversions changes...

Page 4: ...d must comply with the European Drinking Water Directive 98 83 EC Before using the device with water that does not comply with this Direc tive it is essential to consult the manufac turer 1 2 2 Water...

Page 5: ...n The rotary flange fitting must be fitted so that it is free from mechanical stress or strain Otherwise mechanical damage to the pipe or the rotary flange fitting up to and including breaks can resul...

Page 6: ...ched directly to the device e g Direction of flow arrow Type label Cleaning information must be observed and maintained in legible condition 1 5 Units used Unit Conversion bar 1 bar 105 Pa 0 1 N mm2 D...

Page 7: ...water from backwashing 2 3 Materials used The materials used are resistant to the physical chemical and corrosive loads expected to be encountered in drinking water They meet the requirements speci f...

Page 8: ...or support To ensure convenient operation and main tenance of the device always adhere to the specified clearances in chapter 3 4 1 3 1 1 Requirements for the place of installation CAUTION The instal...

Page 9: ...the unit in order to interrupt the water supply during installation mainte nance repair or malfunction of the device Install the device in a vertical position 5 the connection for waste water from ba...

Page 10: ...w meters to the closest wastewater connection The dimen sioning of this pipe must correspond to the backwashing water valve Attention The hose must run without kinks The hose or pipe must be laid with...

Page 11: ...Installation 3 4 1 Drainage options for the backwash water 1701428 2022 01 JUDO JSY LF 11...

Page 12: ...reversing the water flow from inside to out side deposits on the sieve fabric are car ried away and rinsed out with the back wash water The suction pipes also clean the inside of the transparent filt...

Page 13: ...ication but ton on the front of the device to the next backwashing due date as a reminder The JU Control app which is available free of charge reminds you on a mobile device mobile phone tablet etc wh...

Page 14: ...om the built in rotary flange for maintenance or repair leakage might occur if not properly re attached For reattachment observe the instructions for mounting the device see 3 3 4 4 Temporary removal...

Page 15: ...of the device but only use clear water to avoid embrittlement of the plastic 6 2 Warranty and maintenance Prerequisite for obtaining the statutory war ranty claim is regular backwashing see chapter 4...

Page 16: ...r Rated flow after backwash ing with 0 2 0 5 bar pressure loss 3 7 6 1 m h 4 4 7 1 m h 4 5 7 3 m h 7 4 12 2 m h 9 2 15 1 m h Mesh size sieve insert 100 m 0 1 mm 100 m 0 1 mm 100 m 0 1 mm 100 m 0 1 mm...

Page 17: ...LF 2 A 180 195 230 252 280 B 115 115 115 114 114 C 122 122 117 33 40 D 264 264 269 336 344 G 50 50 50 50 50 G1 13 13 13 13 13 Table 2 Dimensions without unit in mm A Installation length B Device width...

Page 18: ...Technical data 7 3 Spare parts JSY LF 1 18 JUDO JSY LF 1701428 2022 01...

Page 19: ...LF 1 1 2070357 51 2 Flange cover JSY LF 1 1 2070358 51 3 Display button 1 4 Hexagon socket head screw M6 30 set with 4 pcs 1 2110109 2 5 Profile flange seal 1 6 Sieve insert 1 7 Suction pipe 1 8 O ri...

Page 20: ...ignation Pcs Order No AU1 Pcs 21 Handwheel for backwashing actuation 1 1 AU Accounting unit articles without an accounting unit are only available as part of a set Replacement interval 4 years 20 JUDO...

Page 21: ...Technical data JSY LF 1 2 1701428 2022 01 JUDO JSY LF 21...

Page 22: ...1 4 Suction pipe pre installed 1 5 O ring 18 2 5 2 6 Flush valve preassembled 1 7 Suction pipe bottom 1 8 Filter bowl item 2 7 9 1 2170575 192 9 Flange 1 10 Filter bowl cover JSY LF 1 1 2170243 39 10...

Page 23: ...he local recycling system To protect environment old appliances must not be disposed of with household waste Instead use the local collection and return points which are committed to free and environm...

Page 24: ...udo online ch judo online ch BENELUX JUDO Wasseraufbereitung GmbH Filiaal Filiale Benelux Laarbeeklaan Av du Laerbeek 72 A1 B 1090 Brussel Bruxelles Phone 32 0 24 60 12 88 Fax 32 0 24 61 18 85 E mail...

Reviews: