
Page 5 of 15
MP-CB (CE)
3. Connecting the control box to the MP termination press
3. MP press connection – Connect pipe No.1 from the control
box to the No.1 connection on the MP press cylinder.
Connect pipe No.2 from the control box to the lower
connection on the press.
4. Connect the main air supply to the control box and check the
air pressure is 75 – 100 Psi.