5.4.
Assemble the piston connecting rod
Ay, connecting rod bush and
connecting rod bearing cover
according to the following
instructions.
5.4.1. The openings of the air ring and oil
ring should match the specified
direction.
5.4.2. Use nylon sleeves for the bolts of
the connecting rod to prevent from
scraping the cylinder hole and axial
diameter
5.4.3.
Apply lubricating oil to the piston,
the connecting rod and the surfaces
of the other related moving parts.
5.4.4. Make sure the frontward indication
mark on the piston. Should be
frontward and assemble the piston
connecting rod Ay with SST.
Attention
The cylinder number on the
piston connecting rod should be identical
to the cylinder number.
5.4.5. Assemble the connecting rod
bearing cover and bush according
to the following instructions.
5.4.5.1. Smear a little lubricating oil on the
bolt and screw nut stand before
they are mounted according to the
indication mark.
5.4.5.2. Tighten the left and right screw
nuts alternately for a couple of
times with the specified torque.
[Torque]
:
40
±
2N.m
Attention
The connecting rod and the rod
bush should be bought from the same
supplier
Summary of Contents for JNSZ1100SV
Page 3: ...Warranty policy...
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 35: ......
Page 37: ...13 ENGINE WIRING DIAGRAM...
Page 86: ...85 16 ELECTRIC INJECTION SYSTE...
Page 87: ...86...
Page 88: ...87...
Page 89: ...88...
Page 90: ...89...
Page 91: ...90...
Page 92: ...91...
Page 93: ...92...
Page 94: ...93...
Page 95: ...94...
Page 96: ...95...
Page 97: ...96...
Page 98: ...97...
Page 99: ...98...
Page 100: ...99...
Page 101: ...100...
Page 102: ...101...
Page 103: ...102...
Page 104: ...103...
Page 105: ...104...
Page 106: ...105...
Page 107: ...106...
Page 108: ...107...
Page 109: ...108...
Page 110: ...109...
Page 111: ...110...
Page 112: ...111...
Page 113: ...112...
Page 114: ...113...
Page 115: ...114...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 121: ...120...
Page 122: ...121...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 126: ...125...
Page 127: ...126...
Page 128: ...127...
Page 129: ...205 DEALER PRE DELIVERY INSPECTION...