INSTALLATION INSTRUCTIONS
Before installing this product, make sure it complies with your request and that it suits your application!
1.1 Unpack the unit and visually inspect for any transport damage incurred after leaving our factory.
1.2 Depressurise the system before installation or maintenance is carried out!
1.3
Top inlet connection:
Locate a suitable condensate draining point on your compressed air system and
connect your valve as illustrated.
- The use of a ball valve is advisable.
1.4a
Side inlet connection:
The side inlet connection must be used in the case of a horizontal condensate
feed pipe. Remove the side inlet plug using an 10mm Allen key.
1.4b
Side inlet connection:
An equalizing line must be installed from the top inlet to a higher point in the air
system. The equalizing line and condensate feed pipe should be at the same pressure.
- The use of a ball valve is advisable.
1.5 Connect the outlet to an oil/water separator.
- We advise to use the nipple supplied with your drain. If it is necessary to use an alternative nipple, make
sure it is of the correct thread (1/8” BSP). Do not over tighten!
1.6 Slowly pressurize the system.
1.7 Your drain is ready for operation!
Note: We advise to check this product at least once a year and replace serviceable parts when necessary.