16
17
When required
Chain tension
The chain in the electromagnet rail
should not be slacking.
Stretch the chain by tightening both
bolts equally.
Inner beams
Grease (80 ml, DIN 51502, KP2K-
20) the inner beams if the roller
bed’s movements are sluggish
and/or jerky.
Electromagnet rail
Grease (30 ml, DIN 51502, KP2K-
20) the inside of the rail if the
elektromagnet arm movements are
sluggish and/or jerky.
Summary of Contents for Transfer
Page 1: ...JOPROTransfer ENGLISH...
Page 7: ...7 Moves JOPRO Transfer along the guiding rail Raises and lowers the roller bed...
Page 9: ...9 Turns the electromagnet 180 left and right...
Page 11: ...11 The electromagnet must be cen tered on the battery The rollers must be on the same level...
Page 13: ...13 Transport the battery so far onto the roller bed that it rides on the battery brake pads...
Page 18: ...18 L2 L1 Spare Parts JOPRO Transfer Mechanics 020 0101 020 5001...
Page 19: ...19 050 0306 050 0201 050 0202 040 0802 040 0401 040 0503 040 0402 040 0504...
Page 24: ...24...
Page 25: ...25...
Page 26: ...26...