16 –
English
Maintenance
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For those points not described in this manual,
visit an authorised service workshop.
1)
First change after 8 hours. When operating with a heavy load or at high ambient temperatures, replace every 25 hours.
2)
Clean
and replace the filter more often in dusty conditions.
3)
If the machine is used daily it should be lubricated twice a week.
4)
Conducted
by authorised service workshop.
X = Described in this operator's manual
O = Not described in this operator's manual
Maintenance
Daily maintenance
before starting
At least once
a year
Maintenance
interval in hours
25
50
100 200
Cleaning
X
Check the engine’s oil level
X
Check the engine’s cooling air intake
X
Check the steering wires
X
Check the brakes
X
Check the battery
X
Check the safety system
X
Check nuts and screws
O
Check for fuel and oil leakage.
O
Clean around the silencer
O
Change engine oil
1)
X
X
Replace the air filter’s prefilter2)
X
Check the cutting deck
X
Check the air pressure in the tyres, 60 kPa/8.5 PSI.
X
Lubricate joints and shafts
3)
X
Check the V-belts
O
Checking and adjusting of throttle wire
X
Replace the air filter’s pre-filter and paper filter
2)
X
Replace the fuel filter
X
Replace the spark plug.
X
Check the fuel hose. Replace if necessary .
4)
O
!
WARNING! No service procedures must be
conducted on the engine or cutting unit
unless:
The engine is switched off.
The ignition key is removed.
The ignition cable has been removed from
the spark plug.
The parking brake is applied.
The cutting unit is disengaged.