Jolly LP-H400 User Manual Download Page 8

4.1 Mounting

For the various mounting positions of the FIXTURE(standing on the floor, sideways  or  hanging  different
accessories kits are available.

Through this a safe and firm installation is assured.

You’ll find special connectors on the bottom side of the system which are put to use here.

4

.

2 Installing the Clamps

Please consider the respective national norm s during the Installation!The

 

installation must only be  car-

ried out by an authorized dealer

!

The installation of the projector has to be built and constructed in a way that it can hold 10 times the

 

wei-

ght for 1 hour without any harming deformation.

The installation must always be secured with a secondary  safety  attachment, e.g.an  appropriate  catch 
net.This secondary safety attachment must be constructed in a

 

way

 

that

 

no

 

part

 

of

 

the

 

installation can 

fall

 

if

 

the

 

main

 

attachment

 

fails

.

When servicing the fixture staying in the area below the installation place,on bridges,under high working 
places and other endangered areas is forbidden.

The operator has to make sure that  safety-relating and machine-technical  installations are approved by 
an expert before taking into operation for the first time and after changes before taking into operation an-
other time.

The operator has to make sure that  safety-relating and machine-technical  installations are approved by
an expert after every four year in the course of an acceptance test.

The operator has to make sure that  safety-relating and machine-technical  installations are approved by
 a skilled person once a year.

The projector should be installed outside areas where persons m ay walk by or be seated.

Important!

Overhead rigging requires extensive expering CE

,

including 

(

but

 

not

 

limited

 

to

)

calculating 

working load limits, installation material being used, and periodic safety inspection of all

 

installation ma-

terial and the projector. If you lack these qualifications, do not attempt the installation yourself, but inste-
ad use a professional structural rigger. Improper  installation can  result in bodilyinjury and or damage  to 
property.

The projector has to be installed out of the reach of people.

If the projector shall be lowered from the ceiling or high joists, professional trussing system s have
to be used. The projector must never be fixed swinging freely in the room .

Caution Projectors  may cause  severe  injuries when crashing down! If you have  doubts

 

concerning the 

safety of a possible installation, do not install the projector!

Before rigging make sure that the installation area can hold a minim um point load of 10 times the
projector s weight.

4.Rigging the fixture

Pay attention to the regulations of CE.

Installation by qualified staff to complete.

- 4 -

Summary of Contents for LP-H400

Page 1: ...USER MANUAL LP H400 Version 1 0...

Page 2: ......

Page 3: ...cification 10 10 1 Electrical paramters 10 10 2 10 3 4 2Installing the Clamps 4 4 3 Power supply connection and cut off 5 4 4 Power Connection 5 4 5 DMX 512 connection connection between fixtures 6 7...

Page 4: ...ly read this instruction manual in its entirety and keep it well for using reference This manual contained about the installation and the relative using information of this products Plese refere this...

Page 5: ...CS 5 Power cable 1PC 5 Service card 1PC When receive the product please be careful to take and put check if the product has damage or not be cause of transportation and check the following parts This...

Page 6: ...ector Maximum ambient temperature Do not operate the fixture if the ambient temperatuer Ta exceeds 40 C 104 F Temperature of the external surface The maximum temperature that can be reached on the ext...

Page 7: ...istance between light output and the illuminated surface must be more than 0 2 meters Make sure that the area below the installation place is blocked when rigging derigging or servicing the fi xture A...

Page 8: ...r has to make sure that safety relating and machine technical installations are approved by an expert after every four year in the course of an acceptance test The operator has to make sure that safet...

Page 9: ...on is safe and reliable Warning The maximum connecting is less than 4 pcs to make sure the normal life time of the lighting fixture 4 3 Power supply connection and cut off Connect the light source to...

Page 10: ...R socket DMX output 3 pin XLR socket Warning please verify the power of the power supply equipment prior to the connection Earth wire must be grounded 6 DMX Terminator Diagram For installations where...

Page 11: ...ion of the device 7 1 Shade leaf 2 Head 3 Lamp tubes 4 Arm 5 Power in 6 7 MODE button 8 Display 9 UP button 10 DOWNR button 11 ENTER button 12 13 Power Out 3 pin XLR male 3 pin XLR female 6 5 7 8 9 10...

Page 12: ...6 Dimension 8 227 150 30 268 275 516 199 277...

Page 13: ...process the LCD screen will display the corresponding fault information can be compared to the information content of the lamp to be amended if in doubt consult the relevant technical personnel Error...

Page 14: ...th a soft brush The interior of the fixture should be cleaned at least annua lly usinga vacuum cleaner or an air jet Maintenance and maintenance of the operation please contact the manufacturer or dis...

Page 15: ...ue displayble 3 Monitor could ON OFF automatically Show fixture lamp use time 5 After the DMX signal is disconnected the display will be bright and dark 6 With DMX Software upgrade 4 7 With RDM functi...

Page 16: ...otice please take specification you have on hand and our company reserves the final right of interpretation L N E L 12V GND 57V D DMX D DMX J10 Y2 U1 L3 J18 U1 Y1 Fan sens V 12V GND 5V B A ADC VCC J2...

Page 17: ......

Page 18: ...2 Changsha Street Shachong Village shiji Tow Panyu District Guangzhou China http www jollylight ing com Guangzhou hongcai stage equipment Co Ltd Tel 862084558833 Fax 862084559699 Email info jollylight...

Reviews: