Page Issue A
Chapter - Servicing Procedures
5:10
CN101 - Maintenance
4. Rotate the steering until full right hand lock is achieved and the right hand rear most steering
lock is in contact with the axle assembly. With the steering in this position adjust the left hand
front steering lock until it also contacts the axle assembly.
5. Rotate the steering until full left hand lock is achieved and the left hand rear most steering
lock is in contact with the axle assembly. With the steering in this position adjust the right hand
front steering lock until it also contacts the axle assembly.
6. Centralise steering.
7. Refit the road wheels torqueing the bolts to 100Nm.
8. Return the vehicle to the ground and road test to ensure full operation of steering.
Tools Required
1 x Trolley jack (capable of safely lifting the vehicle to the required height).
2 x Axle stands (sufficient to support the vehicle safely at the required height)
1 x 27mm spanner.
1 x 22mm spanner.
2 x 17mm spanner.
1 x 13mm spanner.
1 x 13, 19, 17 and 22mm sockets with a ratchet.
1 x Torque wrench (Suitable for above sockets and able to give between 40Nm and 100Nm
measurements.
1 x Ball joint separator.
1 x Tracking gauges.
Parts Required
Kit part number - TB1522
Description
Part Number
Quantity
Ball Joint
7022475
1 Off
Adaptor
7021822
1 Off
Swivel Housing - RH
7001770
1 Off
Loctite 243
Reference
Standard Repair Time
120 minutes.
Note:
This design improvement has been introduced in production from Manufacturing Sequence
Number 0175.
All
Copyright
and
rights
are
the
property
of
Johnston
Sweepers
Ltd.