Installation Procedure
17
Installation Procedure
Electrical Wiring
Wiring procedure
1) Remove set screws on the side before taking off the front panel toward the direction.
2) Connect wires to the terminal block correctly and fix the wires with a wire clamp equipped nearby the terminal block.
3) Route the wires in a proper way and penetrate the wires through the opening for electrical wiring on the side panel.
WARNING:
INTERCONNECTING WIRES MUST BE WIRED ACCORDING TO FIGURE BELOW. INCORRECT WIRING MAY CAUSE
EQUIPMENT DAMAGE.
Power supply :1PH,220-230V~,50Hz
Outdoor unit
terminal block
To indoor unit
Y/G
1 2 3
L N
Test Run
CAUTION!
THIS UNIT WILL BE STARTED INSTANTLY WITHOUT "ON" OPERATION WHEN ELECTRIC POWER IS SUPPLIED.
BE SURE TO EXECUTE "OFF" OPERATION BEFORE ELECTRIC POWER IS DISCONNECTED FOR SERVICING.
This unit has a function of automatic restart system after recovering power stoppage.
1. Before starting test run (for all Heat pump models)
Confirm whether the power source breaker (main switch) of the unit has been turned on for over 12 hrs to energize the
crankcase heater in advance of operation.
2.Test run
Suction pressure at check joint of service valve for gas pipe.
Discharge pressure at check joint on the compressor discharge pipe.
Temperature difference between return air and supply air for indoor unit.
Outdoor unit
terminal block
Indoor unit
terminal block
Power supply:380-400V, 3N~,50Hz
Y/G
1 2 3
Y/G
1 2 3
R S T N
Run the unit continuously for about 30 minutes, and check the following.
24K
36K
28K
48K(3 phase)
48K(1 phase)
60K